Critical path redundant logic for mitigation of hardware...

Electronic digital logic circuitry – With test facilitating feature

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C326S009000, C326S014000

Reexamination Certificate

active

07898286

ABSTRACT:
Cross-die connection structure and method for a die or chip includes buffer elements having a buffer driver and bypass, and control lines coupled to the buffer elements in order to select one of the buffer driver and bypass for each respective buffer element. A logic network is arranged with the buffer elements to form functional paths, a test unit is structured and arranged to test the functional paths and to be coupled to the control lines, and a configuration storage register to set the selected one of the buffer driver and bypass for each passing functional path.

REFERENCES:
patent: 3708686 (1973-01-01), Butler et al.
patent: 4831725 (1989-05-01), Dunham et al.
patent: 5355090 (1994-10-01), Pajowski et al.
patent: 5515403 (1996-05-01), Sloan et al.
patent: 5973978 (1999-10-01), Cutter et al.
patent: 6043942 (2000-03-01), Cunningham et al.
patent: 6272439 (2001-08-01), Buer et al.
patent: 6415402 (2002-07-01), Bishop et al.
patent: 6823470 (2004-11-01), Smith et al.
patent: 2005/0258857 (2005-11-01), Whetsel
patent: 2009/0167337 (2009-07-01), Yamane et al.
patent: 2009/0212799 (2009-08-01), de la Puente et al.
Andreas Veneris, et al.; “Design Rewiring Using ATPG”; IEEE Transactions on Computer-Aided Design of Intergrated Circuits and Systems, vol. 21, No. 12, Dec. 2002; pp. 1469-1479.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Critical path redundant logic for mitigation of hardware... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Critical path redundant logic for mitigation of hardware..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Critical path redundant logic for mitigation of hardware... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2701962

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.