Base cell for engineering change order (ECO) implementation

Electronic digital logic circuitry – Significant integrated structure – layout – or layout...

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C326S102000, C326S009000, C326S038000, C326S039000

Reexamination Certificate

active

07965107

ABSTRACT:
A base cell for an Engineering Change Order (ECO) implementation having at least a first pair of CMOS transistors and a second pair of CMOS transistors, characterized in that said at least first pair of CMOS transistors have a common gate and said at least second pair of CMOS transistors have separate gates.

REFERENCES:
patent: 5502404 (1996-03-01), Landers et al.
patent: 6255845 (2001-07-01), Wong et al.
patent: 2005/0189569 (2005-09-01), Hartwig
patent: 2005/0235240 (2005-10-01), Tien
patent: 2006/0027835 (2006-02-01), Yamagami
patent: 2007/0157151 (2007-07-01), Kim
patent: 2007/0300202 (2007-12-01), Uchida

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Base cell for engineering change order (ECO) implementation does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Base cell for engineering change order (ECO) implementation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Base cell for engineering change order (ECO) implementation will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2661431

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.