Integration construction between a boiler and a steam...

Power plants – Motive fluid energized by externally applied heat – Process of power production or system operation

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C060S679000

Reexamination Certificate

active

06951106

ABSTRACT:
The present invention concerns an integration construction between a steam boiler provided with a combustion chamber and a steam turbine. The steam is conducted from the steam boiler (10) along a connector to the steam turbine (11) for rotating an electric generator (K) producing electricity. The supply water circulated via the steam boiler (10) is vaporized in a vaporizer (190) located in the steam boiler (10) and superheated in a superheater (120). The supply water is conducted into the boiler through an economizer (20) acting as a heat exchanger, where heat is transferred from the flue gases of the boiler into the supply water. The economizer (20) is provided with at least two sections, comprising at least one first economizer section (20a1) and at least one second economizer section (20a2). The supply water is conducted from the first economizer section (20a1) to a supply water preheater formed from a heat exchanger (14), where thermal energy is transferred from bled steams of the steam turbine either directly or via a medium, advantageously water, into the supply water. The supply water preheated with bled steams of the steam turbine is conducted in the steam boiler (10) to the second economizer section (20a2) and further to the vaporizer (190) and the superheater (120) and therethrough, in the form of steam, to the steam turbine. In the integration construction, the temperature of the supply water is raised continuously as the supply water is flowing in the first economizer section (20a1) and from the first economizer section (20a1) to the supply water preheater (14) and threthrough, to the second economizer section (20a2). The connector (13a1.1) leading to the supply water preheater (14) comprises a valve (21) for controlling the bled-steam.

REFERENCES:
patent: 3667217 (1972-06-01), Vidal et al.
patent: 3913330 (1975-10-01), Horlitz, Jr.
patent: 4173949 (1979-11-01), Roethe
patent: 4866928 (1989-09-01), Raiko
patent: 4976107 (1990-12-01), Korpela
patent: 5175993 (1993-01-01), Raiko et al.
patent: 5840130 (1998-11-01), Liebig et al.
patent: 6560966 (2003-05-01), Fetescu et al.
patent: 6813888 (2004-11-01), Raiko
patent: 0037845 (1981-10-01), None
patent: 0724683 (1995-04-01), None
patent: 1050667 (1999-05-01), None
patent: 0724683 (2000-06-01), None
patent: 77512 (1988-11-01), None
patent: 101163 (1995-04-01), None
patent: 9511370 (1995-04-01), None

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Integration construction between a boiler and a steam... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Integration construction between a boiler and a steam..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Integration construction between a boiler and a steam... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3458301

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.