System and process for job scheduling to minimize...

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Operations research or analysis

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C705S007120, C705S007110

Reexamination Certificate

active

07991633

ABSTRACT:
Increased efficiency and lower cost job scheduling is provided by a system and method that optimizes for cost instead of makespan, and minimizes fluctuations in resource utilization. A schedule is constructed using a workflow scheduling system that includes a load leveler, a cost minimizer, and a manpower planner. The load leveler minimizes makespan, subject to resource limits, and then lowers the resource limits, repeating the process in order to create a flatter schedule. The cost minimizer generates an initial solution, and then incrementally improves it, using the manpower planner to evaluate the different possible solutions. The manpower planner calculates, for a given schedule, the optimal hire/fire decisions to minimize total cost.

REFERENCES:
patent: 5291397 (1994-03-01), Powell
patent: 5524077 (1996-06-01), Faaland et al.
patent: 5548506 (1996-08-01), Srinivasan
patent: 5767848 (1998-06-01), Matsuzaki et al.
patent: 5911134 (1999-06-01), Castonguay et al.
patent: 6070144 (2000-05-01), Ginsberg et al.
patent: 6415259 (2002-07-01), Wolfinger et al.
patent: 6490566 (2002-12-01), Schmidt
patent: 6578005 (2003-06-01), Lesaint et al.
patent: 6678698 (2004-01-01), Fredell et al.
patent: 2001/0047274 (2001-11-01), Borton
patent: 2002/0052770 (2002-05-01), Podrazhansky
patent: 2002/0065702 (2002-05-01), Caulfield
(Smith) A. Cesta, A. Oddi, and Stephen Smith, “Iterative Flattening: A Scalable Method for Solving Multi-Capacity Scheduling Problems,” Proceedings National Conference on Artificial Intelligence (AAAI-00), Jul. 2000.
(Amico) Dell'Amico, M. and Trubian, M. 1993. Applying tabu search to the job-shop scheduling problem. Ann. Oper. Res. 41, 1-4 (May 1993), 231-252.
(Stidsen) T. Stidsen, L. V. Kragelund, O. Mateescu, Jobshop Scheduling in a Shipyard, European Conference on Artificial Intelligence, Budapest, 1996.
A Heuristic Model for Scheduling Large Projects with Limited Resources Author(s): Jerome D. Wiest Source: Management Science, vol. 13, No. 6, Series B, Managerial (Feb. 1967), pp. B359-B377.
“A Heuristic Model for Scheduling Large Projects with Limited Resources” Jerome D Wiest Management Science, vol. 13, No. 6, Series B, Managerial (Feb. 1967).
Smith et al., “Slack-Based Heuristics for Constraint Satisfaction Scheduling”,AAAI-93 Proceedings(www.aaai.org), 139-144 (1993).

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

System and process for job scheduling to minimize... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with System and process for job scheduling to minimize..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and System and process for job scheduling to minimize... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2731030

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.