Special engineering change order cells

Computer-aided design and analysis of circuits and semiconductor – Nanotechnology related integrated circuit design

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C716S030000, C716S030000, C716S030000, C716S030000

Reexamination Certificate

active

07634748

ABSTRACT:
A method for correcting a plurality of violations in a circuit design and new cells used in the method are disclosed. The method generally includes the steps of (A) implementing a first engineering change order in the circuit design to correct a first of the violations, (B) implementing a second engineering change order with a special cell to correct a second of the violations, the special cell having a plurality of interfaces available for a signal path associated with the second violation, each of the interfaces having a characteristic appropriate to correct the second violation, each of the characteristics having a different performance and (C) routing the signal path to one of the interfaces to fix the second violation.

REFERENCES:
patent: 6184711 (2001-02-01), Graef et al.
patent: 2002/0162086 (2002-10-01), Morgan
patent: 2004/0199879 (2004-10-01), Bradfield et al.
patent: 2006/0031796 (2006-02-01), Meaney

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Special engineering change order cells does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Special engineering change order cells, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Special engineering change order cells will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4062452

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.