ABSTRACT:
A method and computer program product for optimizing critical path delay in an integrated circuit design include steps of: (a) receiving as input an integrated circuit design; (b) performing a timing/crosstalk analysis to identify each timing critical net in the integrated circuit design; (c) selecting an optimum interconnect configuration for minimizing path delay in each timing critical net; (e) performing a detailed routing that includes the selected optimum interconnect configuration for each timing critical net; and (f) generating as output the detailed routing.
REFERENCES:
patent: 5724250 (1998-03-01), Kerzman et al.
patent: 6378109 (2002-04-01), Young et al.
patent: 6480998 (2002-11-01), Mukherjee et al.
patent: 6590419 (2003-07-01), Betz et al.
patent: 6810505 (2004-10-01), Tetelbaum et al.
patent: 6907590 (2005-06-01), Al-Dabagh et al.
patent: 2004/0103386 (2004-05-01), Becer et al.
Ahrens Dana
Li Weidan
Mbouombouo Benjamin
Do Thuan
LSI Logic Corporation
Whitesell Eric J.
LandOfFree
Method of optimizing critical path delay in an integrated... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of optimizing critical path delay in an integrated..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of optimizing critical path delay in an integrated... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3876391