Computer-aided design and analysis of circuits and semiconductor – Nanotechnology related integrated circuit design
Reexamination Certificate
2006-11-14
2006-11-14
Dinh, Paul (Department: 2825)
Computer-aided design and analysis of circuits and semiconductor
Nanotechnology related integrated circuit design
C716S030000, C716S030000, C716S030000
Reexamination Certificate
active
07137094
ABSTRACT:
An engineering change order (ECO) base cell module is disclosed along with some of its applications. The cell has an N well and P well, P+ implant and N+ implant regions, N well pick-up and P well pick-up regions, a first power supply line, and a second power supply line, wherein the ECO base cell has a same configuration as a standard logic cell and is alterable in at least one metal layer for making one or more connections to form a functional logic cell.
REFERENCES:
patent: 6502229 (2002-12-01), Lee et al.
patent: 2003/0182649 (2003-09-01), Harn
patent: 2006/0026546 (2006-02-01), Dinter et al.
Dinh Paul
Duane Morris LLP
Taiwan Semiconductor Manufacturing Company
LandOfFree
Method for reducing layers revision in engineering change order does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for reducing layers revision in engineering change order, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for reducing layers revision in engineering change order will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3628655