Method and apparatus for implementing engineering change orders

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

364490, 364489, 364488, G06F 1700, G06F 1750

Patent

active

059532360

ABSTRACT:
A method for laying out an integrated circuit design based upon a netlist provided by a behavioral synthesis tool includes the steps of: (a) placing cells specified by the netlist in a layout area in a placement step, the cells including pins that are interconnected by nets; (b) verifying timing constraints in a timing verification step of the placed cells in the layout area; and (c) if the timing verification step indicates that timing does not verify in that the timing constraints are not met: (i) modifying the netlist pursuant to an engineering change order (ECO); and (ii) making an ECO placement of at least one cell into the layout area based upon the timing constraints while adjusting any affected nets as specified by the netlist. A layout tool implements the method on a computer system to form a portion of and integrated circuit fabrication system.

REFERENCES:
patent: 4964057 (1990-10-01), Yabe
patent: 5111413 (1992-05-01), Lazansky et al.
patent: 5164907 (1992-11-01), Yabe
patent: 5237514 (1993-08-01), Curtin
patent: 5396435 (1995-03-01), Ginetti
patent: 5461576 (1995-10-01), Tsay et al.
patent: 5550748 (1996-08-01), Xiong
patent: 5557533 (1996-09-01), Koford et al.
patent: 5587923 (1996-12-01), Wang
patent: 5638291 (1997-06-01), Li et al.
patent: 5666290 (1997-09-01), Li et al.
1.132 Affidavit and Software Release Notes, Physical Design Tools V8R4.6.5 Beta, Nov. 14, 1994, Compass Design Automation, San Jose, CA.
Software Release Notes, Physical Design Tools V8R4.6.5 Beta, Nov. 14, 1994, Compass Design Automation, San Jose, CA.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method and apparatus for implementing engineering change orders does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method and apparatus for implementing engineering change orders , we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and apparatus for implementing engineering change orders will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1516291

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.