ABSTRACT:

CROSS REFERENCE TO RELATED APPLICATIONS
This application claims priority to Japanese Patent Application No. JP 2001-034739, filed on Feb. 13, 2001, and the disclosure of such application is herein incorporated by reference to the extent permitted by law.
BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention is related to a production method for lot management. Specifically, the present invention relates to a lot management production method for a production line in which there is provided at least one apparatus of each variety of processing apparatuses for each variety of product, and a product-carrying container (for example, a wafer cassette) thereof. In such line, one lot of a designated number of pieces of a same variety/product (for example, a semiconductor wafer) loaded/carried in a carrying container constitutes a minimum unit for consideration. Also, the present invention also relates to a production method and a carrying container thereof, in which production is carried out in large volume of large variety and a whole set of processing steps is performed against each lot according to a sequence corresponding to the variety/product of the lot.
2. Related Art
A wafer process is essential to a semiconductor apparatus manufacturing process and requires a large variety of production processes such as oxidation, resist film coating, exposure, development, etching, diffusion, CVD (Chemical Vapor Deposition), PVD (Physical Vapor Deposition), etc. Such processes are performed on a production line having provided for each variety of product, one or a plurality of apparatuses corresponding to different processing steps.
In addition, a plurality of semiconductor wafers constituting semiconductor apparatuses of different varieties flow through the line on a lot basis. That is, a semiconductor wafer or piece in each lot is transported from a production line to an assembly line after passing through a set of processes according to a sequence determined for a corresponding variety of product to which the piece pertains. A lot is constituted by a predetermined number of semiconductor wafers, for example 24 pieces (alternatively, 25, 50, 100, etc.), and it has been usual practice to perform a whole set of processing steps for each variety, upon loading the number of pieces of semiconductor wafers constituting a lot of, for example, 24 pieces, on a wafer cassette.
FIG. 5
schematically shows a lot flow of a conventional wafer processing production line.
In other words, in the conventional related art, each variety of products (herein after referred to simply as “product”) passes through a process that is independent from processes of other varieties. For example, a lot A of product “a” in
FIG. 5
passes through a process of: Sheet-fed apparatus
1
→Batch apparatus
1
→Sheet-fed apparatus
101
. Such sequence of processes is independent from other lots (lot B, C, etc. in the figure) of other products (“b”, “c”, etc.). Likewise, the same applies to the other lots B, C, etc. of other products “b”, “c”, etc. In addition, although a wafer processing production line is conventionally designed for a production of small variety in large volume, there have been attempts to adapt the line for large volume of a large variety. However, even though such attempts have been made for making it possible to realize a production line under large volume of large variety, the efforts have not been done with regard to large volume of small variety, but in order to keep and increase productivity.
However, as integration and downsizing of the semiconductor apparatuses increased, a larger variety of electronic circuits are included in a semiconductor apparatus and assembled in various kinds of electronic appliances. As a result, great progress has been achieved towards improvement of reliability of the electronic appliances, as well as their downsizing, price reduction, improvement of functions, etc., thus the semiconductor apparatuses have expanded their field of application. Consequently, there is an increased request for reduction of lead-time between order and delivery of products.
In other words, there are a considerable number of semiconductor apparatuses in a production line for wafer processing, as it has been described above (
FIG. 5
is a schematic representation of a lot processing only for general description purposes, so that an actual line would have tens or dozens of processes). As there may be an assembly process following the wafer process, it is not rare to have a time required from start of production until delivery (a lead-time or lap-time) to be around 1 to 3 months. As a result, the order-issuing side issues an order based on this premise, and planning is conventionally made for manufacturing a product set (a radio, a television image receiver or the like) including the semiconductor apparatus as a component or part. Also, an ordered volume for a semiconductor apparatus of a same type used to be large. For example, it no rarely reached tens of thousands or even millions of pieces per month.
However, as the application for semiconductor apparatuses expanded, the semiconductor apparatuses started to be used also in products of relatively short lifetime as well as products of relatively small volume of production. For example, there is a trend for increasing a sort of order in which it is requested to deliver, for example, 2000 pieces of a designated variety of semiconductor apparatus within a period of 1 month. As a result, the semiconductor manufacturer has to cope with the burden of responding to such kind of request.
In view of such situation, semiconductor manufacturers currently make a forecast for prospective orders and produce in large quantity and keep a large intermediate inventory of a variety of semi-processed products, i.e., unfinished products still in process. Then, the remaining processes are performed accordingly whenever there is an actual order, thus allowing delivery as ordered. According to such procedure, it is supposed that the period of time required from order to delivery is reduced by the amount of time of the processes already performed upon the order forecast with the semi-processed products.
Especially for processes that have larger influence on the production lead-time (or lap-time), there is a strong tendency of producing semi-processed semiconductor wafers in large quantity, thus preparing an intermediate inventory that keeps standing by for prospective orders.
However, keeping large volume of intermediate inventory is not a recommended strategy since, as far as business management is concerned, it is unthrifty and constitutes as negative factor for the management. In addition, it is not rare a case in which the forecasted order has not actually been issued. In such a case, the standing by inventory of semi-processed semiconductors is wasted, causing considerable loss.
Also, once a semiconductor wafer enters an intermediate inventory, it may constitute a factor of oversetting the entire production process, as it is usual practice to perform the production process by giving priority to products having order information of higher accuracy. As a result, such intermediate inventory may give raise to considerable oscillation in production lead-time.
Moreover, if an actual ordered quantity is considerably smaller than lot that used to be of, for example, 24 pieces, the excessive pieces of the lot are turned to intermediate inventory, thus causing increase of the inventory.
As a countermeasure, it is possible to consider reducing the size of the lot of the semiconductor wafer to a fraction of the original lot, such as 6 pieces, for example, while keeping the basic rule of producing the semiconductor wafer by lot throughout all processing steps. By such procedure, as far as small-volume orders are concerned, it is expected that the lead-time required until delivery can be considerably reduced.
As an example,
FIG. 6
shows a difference in lap-time (lead-time) according to difference in lot size, by means of a bar graph. Also, a broken

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Lot management production method and product carrying container does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Lot management production method and product carrying container, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Lot management production method and product carrying container will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3145493

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.