Engineering change order process optimization

Computer-aided design and analysis of circuits and semiconductor – Nanotechnology related integrated circuit design

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C716S030000, C703S016000

Reexamination Certificate

active

07552409

ABSTRACT:
A method for reaching signoff closure in an ECO (engineering change order) process involves the use of violation context data from the signoff tool as the basis for design layout modifications in an implementation tool. The violation context data includes violation information other than violation location/path information. Because the signoff tool, and more specifically, the signoff algorithm used by that tool is the most accurate model of actual IC behavior, the use of violation context data generated by the signoff tool to implement changes to the design layout will generally produce appropriate and effective results. By accessing this violation context data from the signoff tool, an implementation tool need not rely on its less accurate implementation analysis to determine the optimal design layout modifications for correcting violations detected by the signoff tool.

REFERENCES:
patent: 5764528 (1998-06-01), Nakamura
patent: 6397373 (2002-05-01), Tseng et al.
patent: 6799308 (2004-09-01), You et al.
patent: 7017131 (2006-03-01), Barnes
patent: 7284215 (2007-10-01), Kim et al.
patent: 7331028 (2008-02-01), Dinter et al.
patent: 2001/0049814 (2001-12-01), Matsumoto et al.
patent: 2003/0159118 (2003-08-01), Lindkvist
patent: 2004/0123259 (2004-06-01), You et al.
patent: 2006/0026546 (2006-02-01), Dinter et al.
patent: 10335467 (1998-12-01), None

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Engineering change order process optimization does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Engineering change order process optimization, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Engineering change order process optimization will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4139225

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.