Computer-aided design and analysis of circuits and semiconductor – Nanotechnology related integrated circuit design
Reexamination Certificate
2008-01-15
2008-01-15
Kik, Phallaka (Department: 2825)
Computer-aided design and analysis of circuits and semiconductor
Nanotechnology related integrated circuit design
C703S016000
Reexamination Certificate
active
11315173
ABSTRACT:
A delay analysis device includes a receiving unit that receives a result of a timing analysis of a target circuit to be analyzed, a detecting unit that detects critical paths having delays within a predetermined range, a statistical-delay computing unit that computes a statistical delay of the target circuit based on a cumulative probability distribution of the delays of the critical paths, and a probability-density-distribution computing unit that computes a probability density distribution of delay of a critical path that has the greatest delay in the result. The detecting unit detects x number of critical paths having cumulative delays within computed probability density distribution.
REFERENCES:
patent: 5365463 (1994-11-01), Donath et al.
patent: 6907590 (2005-06-01), Al-Dabagh et al.
patent: 7086023 (2006-08-01), Visweswariah
patent: 2002/0104065 (2002-08-01), Tsukiyama et al.
patent: 2004/0002844 (2004-01-01), Jess et al.
patent: 2004/0025123 (2004-02-01), Angilivelil
patent: 2005/0066298 (2005-03-01), Visweswariah
patent: 2006/0112158 (2006-05-01), Tetelbaum
patent: 2007/0033554 (2007-02-01), Tsukiyama et al.
patent: 2007/0089074 (2007-04-01), Ramachandran et al.
patent: 2007/0204248 (2007-08-01), Homma et al.
patent: 07-334530 (1995-12-01), None
patent: 2004-252831 (2004-09-01), None
Homma Katsumi
Matsuoka Hidetoshi
Nitta Izumi
Shibuya Toshiyuki
Kik Phallaka
Staas & Halsey , LLP
LandOfFree
Delay analysis device, delay analysis method, and computer... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Delay analysis device, delay analysis method, and computer..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Delay analysis device, delay analysis method, and computer... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3947427