Adaptive cooperative scheduling

Electrical computers and digital processing systems: virtual mac – Task management or control – Process scheduling

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C718S105000, C718S102000

Reexamination Certificate

active

07743383

ABSTRACT:
A method in a computer system for coordinating scheduling of threads among a plurality of processors. The method includes collecting, using a cooperative scheduling component (CSC), system data pertaining to the plurality of processors. The method further includes calculating, using the CSC, unified scheduling-related parameters (USRPs) from the system data. The method additionally includes furnishing the USRPs from the CSC to at least two of a thread launcher, a thread balancer, and a thread stealer, whereby at least two of the thread launcher, the thread balancer, and the thread stealer employ the USRPs to perform their respective scheduling-related tasks.

REFERENCES:
patent: 5826079 (1998-10-01), Boland et al.
patent: 5872972 (1999-02-01), Boland et al.
patent: 2002/0198924 (2002-12-01), Akashi et al.
patent: 2003/0153994 (2003-08-01), Jin et al.
patent: 2004/0010667 (2004-01-01), Brenner

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Adaptive cooperative scheduling does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Adaptive cooperative scheduling, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Adaptive cooperative scheduling will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4220602

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.