Method for controlling the set time of cement

Wells – Processes – Cementing – plugging or consolidating

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

106720, 106725, 106726, 106727, 106803, 166292, 166300, E21B 3313, E21B 3314

Patent

active

056135580

ABSTRACT:
An oil and gas well cementing composition and method are shown utilizing hydraulic cement, water a cement hydration retarder and an additive which is effective over a selected time period to degrade the retarder. The additive is a controlled release oxidizer which releases nascent oxygen over time to gradually oxidize the cement hydration retarder, thereby providing a single cement slurry design for cementing pipes for oil and gas wells where wide temperature differentials exist between the two ends of the pipe.

REFERENCES:
patent: 2985239 (1961-05-01), Shell
patent: 3503768 (1970-03-01), Pervite
patent: 3662830 (1972-05-01), Martin
patent: 4036301 (1977-07-01), Powers et al.
patent: 4065318 (1977-12-01), Detroit et al.
patent: 4450010 (1984-05-01), Burkhalter et al.
patent: 4470463 (1984-09-01), Holland
patent: 4632186 (1986-12-01), Boncan et al.
patent: 5327968 (1994-07-01), Onan et al.
patent: 5336316 (1994-08-01), Dawson et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Method for controlling the set time of cement does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for controlling the set time of cement, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for controlling the set time of cement will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2196741

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.