Workflow scheduler

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Operations research or analysis

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C705S007210, C705S007120, C705S007110, C700S099000, C700S100000, C717S101000

Reexamination Certificate

active

08078487

ABSTRACT:
An interactive workflow schedule optimizer arranged to enable a user to reconfigure an instantiated workflow for a task comprising a plurality of actions having a predetermined dependency relationship to each other. The optimizer comprises means to input one or more user-specified constraint conditions into the workflow schedule optimizer; means to regenerate a workflow dependent on user specified condition from the instantiated workflow, the regenerated workflow satisfying said one or more user-specified constraint conditions. The optimizer optimises the global utilisation of the resources required to fulfil the user request by processing in parallel the resource requirements of each of said plurality of actions required by the regenerated workflow.

REFERENCES:
patent: 5093794 (1992-03-01), Howie et al.
patent: 5212791 (1993-05-01), Damian et al.
patent: 5408663 (1995-04-01), Miller
patent: 5630069 (1997-05-01), Flores et al.
patent: 5754857 (1998-05-01), Gadol
patent: 5765140 (1998-06-01), Knudson et al.
patent: 5848403 (1998-12-01), Gabriner et al.
patent: 5918226 (1999-06-01), Tarumi et al.
patent: 6031984 (2000-02-01), Walser
patent: 6115640 (2000-09-01), Tarumi
patent: 6415259 (2002-07-01), Wolfinger et al.
patent: 6519763 (2003-02-01), Kaufer et al.
patent: 6609100 (2003-08-01), Smith et al.
patent: 7028303 (2006-04-01), Lahey et al.
patent: 7386465 (2008-06-01), Friedland et al.
patent: 7865867 (2011-01-01), Keene Potter et al.
patent: 2002/0016729 (2002-02-01), Breitenbach et al.
patent: 2002/0095391 (2002-07-01), Swart et al.
patent: 2003/0115073 (2003-06-01), Todd et al.
patent: 2004/0078258 (2004-04-01), Schulz et al.
patent: 2004/0083448 (2004-04-01), Schulz et al.
patent: 2004/0128173 (2004-07-01), Salonen
patent: 2005/0108074 (2005-05-01), Bloechl et al.
patent: 2005/0209732 (2005-09-01), Audimoolam et al.
patent: 0 778 535 (1997-06-01), None
patent: 0778 535 (1997-06-01), None
patent: 01/06426 (2001-01-01), None
patent: 01/06426 (2001-01-01), None
patent: 01/98933 (2001-12-01), None
ILOG Solver Product Data Sheet, Oct. 2004 ILOG.S.A.
EPO Search Report dated Jun. 3, 2005 in GB 0427133.
N. Duque, et al., “IA Planning for Automatic Generation of Customized Virtual Courses,” Workshop on “Planning and Scheduling: Bridging Theory to Practice,” ECAI 2004.
Henrik Stormer, “Task Scheduling in Agent-Based Workflow,” Proceedings of ICSC Symposium on Multi-Agent and Mobile Agents in Virtual Organizations and E-Commerce (MAMA 2000), Wollogong, Australia, Dec. 2000.
C. Valle, et al., “Combining Heuristics in Assembly Sequence Planning”, Workshop on “Planning and Scheduling: Bridging Theory to Practice,” ECAI 2004.
E. Chantery, et al., “Mission Planning for Autonomous Aerial Vehicles,” Workshop on “Planning and Scheduling: Bridging Theory into Practice,” ECAI 2004.
Priyang Rathod, et al.,“Interactive Incremental Scheduling for Virtual Telescopes in Education,” Proceedings of the Third International NASA Workshop on Planning and Scheduling for Space, Houston, Texas, Oct. 2002.
Charles Plesums, “Introduction to Workflow,” Computer Science Corporation, Financial Services Group http//www.wfmc.org/information/introduction—to—workflow02.pdf, 2002.
Business Process Execution Languge for Web Services, Specification, May 2003 (http://www-106.ibm.com/developerworks/library/ws-bpel/).
V. Kumar, “Algorithms for Constraint-Satisfaction Problems: A Survey,” AI Magazine, V. 13, N. 1, pp. 32-44, 1992.
S. Fernandez, et al., “Planning Tourist Visits Adapted to User Preferences,” Workshop on Planning and Scheduling: Bridging Theory into Practice ECAI 2004.
M. Becker and S. Smith, “Mixed-Initiative Resource Management: The AMC Barrel Allocator,” Proceedings of the 5thInternational Conference on AI Planning and Scheduling, Apr. 2000.
L. S. Homen de Mello and A.C. Sanderson, “AND/OR Graph Representation of Assembly Plans,” IEEE Transactions on Robotics and Automation, V. 6, N. 2, pp. 188-199, 1990.
M. Papazoglou, et al. “Planning for Requests against Web Services,” IEEE Bulletin of the IEEE Computer Society Technical Committed on Data Engineering, 2002.
M. Papazoglou et al., “XSRL: A Request language for Web Services”, 2002.
S. Majithia et al, “A Framework for Automated Service Composition in Service-Oriented Architectures”, 2004.
Anderson, M., “Workflow Interoperability—Enabling E-Commerce,” International Computers Ltd., Jan. 2, 2000.
Database Inspec Online! The Institute of Electrical Engineers, Stevenage, GB: 1997, Tarumi et al: “WorkWeb System Multi-Workflow Management with a Multi-Agent System,” XP002330505.
Database Inspec Online! The Institute of Electrical Engineers, Stevenage, GB: 1997, Tarumi et al: “Dynamic Workflow Scheduling with a Multi-Agent System,” XP002330506.
“iReserve: powering the responsive enterprise,” British Telecommunications plc, 81 Newgate Street, London EC1A 7AJ, UK, 2004.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Workflow scheduler does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Workflow scheduler, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Workflow scheduler will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4314614

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.