Work scheduling method

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

364401, 364513, G06F 1546

Patent

active

050539701

ABSTRACT:
In a scheduling system, constraints changing based on situations and scheduling know-how are implemented according to the knowledge engineering method, whereas computations for the concrete, optimal allocation are conducted according to the mathematical programming method. As a result, there can be achieved a scheduling which can easily cope with changes in the scheduling know-how and constraints and which has a high maintainability and a high computation speed.

REFERENCES:
patent: 4628435 (1986-12-01), Tashiro et al.
patent: 4796194 (1989-01-01), Atherton
patent: 4852001 (1989-07-01), Tsushima et al.
Saji, et al., "Operation Research; 6-4 Assignment Problem", pp. 225-229.
S. Tamano, et al., "Print Circuit Board Design Aiding Expert System", preprint for 33rd meeting of the Information Processing Society of Japan, 1968 (Latter Half), pp. 1165-2266.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Work scheduling method does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Work scheduling method, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Work scheduling method will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1760113

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.