Electrical computers: arithmetic processing and calculating – Electrical digital calculating computer – Particular function performed
Reexamination Certificate
2006-01-24
2006-01-24
Mai, Tan V. (Department: 2193)
Electrical computers: arithmetic processing and calculating
Electrical digital calculating computer
Particular function performed
Reexamination Certificate
active
06990510
ABSTRACT:
Apparatus and method for performing fast arithmetic operations, including addition, in a pipelined circuit. In one embodiment, the apparatus comprises a plurality of gates, the critical path through the plurality of gates being three gates delays for some embodiments. The apparatus may comprise: a first level of logic for receiving at least two binary numbers and generating multi-bit P, G, Z, and K carry signals; a second level of logic receiving the multi-bit P, G, Z, and K carry signals and generating multi-bit section-based carry signals; and a third level of logic receiving the multi-bit section-based carry signals and generating a sum of the received binary numbers, the third level of logic comprising: a plurality of domino logic gates forming sum bits using the multi-bit section-based P, G, Z, and K carry signals.
REFERENCES:
patent: 5327369 (1994-07-01), Ashkenazi
patent: 6373290 (2002-04-01), Forbes
patent: 05-061643 (1993-03-01), None
patent: 06-282417 (1994-10-01), None
patent: 11-353156 (1999-12-01), None
Yee et al “Clock-Delayed Domino for Adder and Combinational Logic Design”, 1996 IEEE, pp. 332-337.
Friend David Michael
Luick David Arnold
Phan Nghia Van
Mai Tan V.
Moser Patterson & Sheridan LLP
LandOfFree
Wide adder with critical path of three gates does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Wide adder with critical path of three gates, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Wide adder with critical path of three gates will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3594146