Turbine installation having a connectable auxiliary group

Power plants – Combustion products used as motive fluid – Process

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C060S786000

Reexamination Certificate

active

07614239

ABSTRACT:
A turbine installation includes a main group and an auxiliary group, wherein the main group has at least one first turbine and a generator connected for drive purposes to the first turbine. The auxiliary group includes at least one second turbine and is connectable to the main group via a coupling. The turbine installation furthermore includes a first braking device configured to apply a braking torque to the auxiliary group when the auxiliary group is decoupled from the main group.

REFERENCES:
patent: 3237404 (1966-03-01), Flanigan et al.
patent: 3306036 (1967-02-01), Wooler
patent: 3692419 (1972-09-01), Katagiri et al.
patent: 3710576 (1973-01-01), Evans et al.
patent: 5315817 (1994-05-01), Vannini et al.
patent: 6724099 (2004-04-01), Klaar et al.
patent: 2003/0167773 (2003-09-01), Mathias et al.
patent: 2004/0159105 (2004-08-01), Tanaka et al.
patent: 156618 (1903-11-01), None
patent: 500076 (1930-06-01), None
patent: 10116387 (2002-10-01), None
patent: 1289118 (2003-03-01), None
patent: 995723 (1951-12-01), None
patent: 1272590 (1972-05-01), None
patent: 2247051 (1992-02-01), None
patent: 03076780 (2003-09-01), None
Michael Valenti, “Making gas turbines safer”, Mechanical Engineering, ASME., New York, US, vol. 120, No. 9, Sep. 1998, pp. 62-65, XP000790423, p. 65.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Turbine installation having a connectable auxiliary group does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Turbine installation having a connectable auxiliary group, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Turbine installation having a connectable auxiliary group will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4133646

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.