Tubular reinforcing dowel system and method

Road structure – process – or apparatus – Pavement – Including joint means

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C404S059000, C404S062000, C404S065000, C052S390000

Reexamination Certificate

active

06171016

ABSTRACT:

BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates generally to concrete reinforcing, and in particular to a reinforcing dowel system and method for concrete slabs.
2. Description of the Prior Art
A typical method of constructing roadways and highways involves pouring a concrete slab over a suitable base course of crushed rock or other material. Concrete is often the preferred material for roadway slabs because it tends to be relatively strong, durable, and cost-effective over the life of a roadway or highway. Moreover, a well-designed and well-constructed concrete roadway may be less susceptible to potholes and the need for resurfacing than a comparable asphalt roadway. The interstate highway system and other major roadways are therefore constructed largely of concrete.
In order to maximize the useful life of a concrete roadway, the design must accommodate various loads to which the slab is subjected and the stresses resulting therefrom. For example, thermal loads result from variations in the ambient temperature. Annual temperature variations of more than 60 degrees Celsius are not uncommon in many areas. Expansion/contraction cycles from temperature changes can be accommodated somewhat by forming construction or expansion joints at regular intervals to allow relative movement between adjacent slab sections. Expansion joints usually comprise gaps between adjacent concrete slabs. The gaps are filled with resilient materials, such as an elastomeric caulk. The caulk expands and compresses in response to the thermal loads on the slabs. Concrete normally reaches its design strength approximately 28 days after it is poured. Partially-cured or “green” concrete can be saw cut relatively easily. Therefore, construction and expansion joints are often cut in concrete slabs when they are partially cured and the fresh concrete is green.
Special slip-forming equipment is commonly used for pouring continuous slabs for concrete roadways. Cracks are expected in large concrete slabs, such as roadways constructed with slip-forming equipment. The crack locations can be controlled by sawing concrete slabs part-way through to form construction joints. Weakened areas are thus formed with less cross-sectional area to resist bending and other stresses. By providing such joints at periodic intervals, cracks are generally limited to the areas of the construction joints whereby intermediate areas tend to remain intact. After partial saw cut construction joints have been formed, a slab will tend to crack along them. The slab will thus be effectively divided into multiple slab sections.
In conventional reinforced concrete roadway construction, steel reinforcing rod dowels are placed across the areas in which the construction joints are cut. The dowels transfer loads between the slab sections. Otherwise the slab sections could act as independent structural elements separated from each other by cracks along their respective construction joints. However, with the construction joints spanned by reinforcing dowels, the adjacent slab sections are generally retained in alignment with each other.
A common practice to accommodate expansion and contraction of the adjacent slab sections is to apply a coat of grease to one end of each reinforcing dowel to permit limited longitudinal slippage. The grease-coated end of a reinforcing dowel can thus reciprocate slightly within the concrete slab in which it is encased.
In conventional concrete slab construction, the dowels are typically secured in place by wire baskets while the concrete slab is being poured. The baskets are adapted for placement on a crushed rock roadway base. The dowels are thus supported over the roadway base at predetermined heights and can be placed approximately medially within the slab.
Such prior art dowel and basket combinations suffered from several disadvantages. For example, the relatively small diameters of the steel reinforcing bar dowels tended to concentrate shear forces over relatively small contact areas. The aforementioned technique of coating one end of a dowel with grease tended to introduce annular clearance between the slab and the dowel. This clearance could lead to the dowels working themselves even more loose after being subjected to relatively large dynamic loads over prolonged periods of time. Loose dowels can lead to premature slab deterioration and failure.
Moreover, previous basket designs included reinforcing wire members which extended across a construction joint. The normal procedure was to cut these joint-spanning wires before the cement was placed. Omitting this step could result in “locked” construction joints. Previous basket designs also interfered with concrete pouring operations.
Heretofore there has not been available a tubular reinforcing dowel system and method with the advantages and features of the present invention.
SUMMARY OF THE INVENTION
In the practice of the present invention, a tubular reinforcing dowel system is provided which includes a plurality of dowel members each comprising a hollow dowel tube and a dowel core. The dowel tube comprises a first material, such as composite fiber or stainless steel. The dowel core comprises a second material, such as hydraulic cement. A basket assembly includes a pair of horizontal runners and a plurality of stands mounted in corresponding, longitudinally-opposed pairs on respective runners. In the practice of the method of the present invention, a roadway is constructed with a crushed rock base and a concrete slab poured thereover. A plurality of dowel members are mounted on a basket assembly by securing the dowel member ends to the basket assembly stands. The basket assembly is then placed on top of the crushed rock base. The slab is poured on top of the crushed rock base and encases the dowel members. A construction joint is saw-cut into the slab over the dowel members.
OBJECTS AND ADVANTAGES OF THE INVENTION
The principal objects and advantages of the present invention, include: providing a tubular reinforcing dowel system; providing such a system with dowel members constructed out of materials which resist corrosion; providing such a system which provides greater effective dowel member diameters than previous systems with steel reinforcing bar dowels; providing such a system which can reduce the stress per unit of contact area between the dowel members and concrete slabs in which they are encased; providing such a reinforcing system which minimizes high stress contact areas between the dowel members and the concrete; providing such a reinforcing system which utilizes relatively inexpensive composite materials in combination with relatively inexpensive cement cores; providing such a reinforcing system which provides relatively high tensible strength and flexibility with a tubular composite fiber dowel tube and a hydraulic cement core with relatively high compressive strength; providing such a reinforcing system which can eliminate the need for applying a coat of grease to parts of the dowel members at construction joints; providing such a reinforcing system which can reduce the clearance between the dowel members and a slab; providing such a reinforcing system which maintains relatively tight joints between the dowel members and a slab; providing such a reinforcing system which eliminates locations where water can collect and freeze; providing such a reinforcing system which provides “hinge” type flexibility in the area of a construction joint in a concrete slab; providing such a reinforcing system with an improved basket assembly for positioning the reinforcing dowel members; providing such a reinforcing system which eliminates the need for basket assembly wires extending across a construction joint; providing such a reinforcing system which can reduce the steps in construction and installation of dowel reinforcing in a slab by eliminating the steps of cutting wires in a basket assembly; providing such a reinforcing system which can prolong the useful operational life of a roadway or highway; providing such a reinforcing syste

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Tubular reinforcing dowel system and method does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Tubular reinforcing dowel system and method, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Tubular reinforcing dowel system and method will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2451811

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.