ABSTRACT:
A method for transformer testing includes receiving a failing test result of a transformer, the test result being determined from a test taken during transformer manufacture, determining, via a knowledge-based system, a predicted root cause of the failure based on the test result and a knowledge base of transformer information, and determining, via the knowledge-based system, a suggested course of action for the failure based on the test result and the knowledge base of transformer information.
REFERENCES:
patent: 3667034 (1972-05-01), Freeze
patent: 5311438 (1994-05-01), Sellers et al.
patent: 5463555 (1995-10-01), Ward et al.
patent: 5629870 (1997-05-01), Farag et al.
patent: 5835764 (1998-11-01), Platt et al.
patent: 5938424 (1999-08-01), Kurogi et al.
patent: 6012152 (2000-01-01), Douik et al.
patent: 6041287 (2000-03-01), Dister et al.
patent: 6300767 (2001-10-01), Kliman et al.
patent: 6324523 (2001-11-01), Killeen, Jr. et al.
patent: 6345259 (2002-02-01), Sandoval
patent: 6369582 (2002-04-01), Coffeen
patent: 6477521 (2002-11-01), Kuomura et al.
patent: 6486678 (2002-11-01), Spears
patent: 6633772 (2003-10-01), Ford et al.
patent: 6636862 (2003-10-01), Lundahal et al.
patent: 2001/0042092 (2001-11-01), Kudo et al.
patent: 2002/0035498 (2002-03-01), Kehoe et al.
patent: 2002/0143598 (2002-10-01), Scheer
patent: 2003/0172002 (2003-09-01), Spira et al.
patent: 2004/0102928 (2004-05-01), Cuddihy et al.
patent: 2004/0124860 (2004-07-01), Hamdan
patent: 2004/0199573 (2004-10-01), Schwartz et al.
patent: 0 567 291 (1993-10-01), None
patent: 0 721 625 (2002-04-01), None
patent: WO 95/09387 (1995-04-01), None
patent: WO 98/57285 (1998-12-01), None
patent: WO 99/15979 (1999-04-01), None
patent: WO 01/02928 (2001-01-01), None
patent: WO 01/50405 (2001-07-01), None
Aldred, K., “Aerospace Manufacturer takes off wit Paperless Manufacturing System”,IEEE Solutions, 1998, 55-57.
Chase, N., “Paperless Manufacturing Pays Off”,Quality, Nov. 1998, 46-47.
deSpautz, J., “Quantifying the Benefits of Automation”,ISA Transactions, 1994, 33, 107-112.
Eckerson, W., “Paperfree Factory gets Patriot Flying”,Network World, 8(52), 2 pages.
Fouhy, k. et al., “Paperless Batch Plants become a Reality”,Chemical Engineering, 1995, 31-33.
Fuller, L.F. et al., “A Joint Industry—university CIM Project for University Microelectronics Manufacturing”,IEEE, 1991, 37-40.
Gould, L., “Data Collection Leads to Paperless Manufacturing”,Managing Automation, May 1993, 48-49.
Jain, H.K. et al., “E-R Approach to Distributed Heterogeneous Database Systems for Integrated Manufacturing”,Information Resources Management Journal, 1992, 3(1), 21-29.
Johanson, D.C. et al., “Application of a B&W Developed Computer Aided Pictorial Process Planning System to CQMS for Manufacturing Process”,Supercollider 4, 1992, 513-516.
Haverson, D.S., RS/6000 Drives Paperless Manufacturing,Applied Solutions, 21-22.
Han, M.H. et al., “Flow Control in Flexible Manufacturing: Minimization of Stockout Cost”,Int. J. Prod. Res., 1989, 27(4), 701-715.
Lindo, W., “Workflow Management und Optimierung der Geschaftsprozesse”,ZWF, 1996, 91, 419-420.
Naylor, A. W. et al., “Design of Integrated Manufacturing System Control Software”,IEEE Transactions on Systems, Man, and Cybernetics, 1987, 17(6), 881-897.
Ram, S.N. et al., “Paperless Manufactruing for IC Assembly”,IEEE/SEMI Int'l Semiconductor Manufacturing Science Symposium, 1992, 90-93.
Remson, M.G., “Paperless Manufacturing, A Challenge Now and in the Future”,IEEE/SEMI Int'l Semiconductor Manufacturing Science Symposium, 1991, 89-94.
Saad, et al., “Effectiveness of Dynamic Rescheduling in Agent-Based Flexible Manufacturing Systems”,SPIE, 3203, 88-99.
Vasilash, G.S., “Meeting the Future Head-on (Machinery Manufacturing)”,Production, Jul. 1993, 50-55.
Vide, J.J. et al., “FMS Work Flow Optimization”,Proceedings of the 1986 Summer Computer Simulation Conference, 1986, 705-710.
von Hardenberg, P.W. et al., “Use of Integrated Knowledge-Based Systems for Helicopter Design and Manufacturing”,American Helicopter Society 51stAnnual Forum, 1995, 1-10.
Shop Solutions-“Islands of Automation have Paperless Links”,Manufacturing Engineering, 1997, 134-136.
“Revamping Manufacturing”,Computer-Aided Engineering, 1995, 10-11.
Min-Hong, H., “Work Flow Control in Automated Manufacturing”, Georgia Institute of Technology.
Dewhurst, F. et al., “Towards Integrated Manufacturing Planning with Common Tool and Information Sets”,International Journal of Operations&Production Management, 2001, 21(11), 1460-1482.
Fung, R.Y.K. et al., “Adaptive Production Scheduling of Virtual Production Systems Using Object-Oriented Petri Nets with Changeable Structure”,Intl. J. Prod. Res., 2002, 40(8), 1759-1785.
Greenwell, R.M. et al., “Computer-aided Acquisition of Manufacturing Information”,Advances in Engineering Software, 1994, 20, 1-12.
Guide, Jr., V.D.R. et al., “Rough-cut Capacity Planning for Remanufacturing Firms”,Production Planning&Control, 1997, 8(3), 237-244.
Hitomi, K., “Strategic Integrated Manufacturing Systems: The Concept and Structures”,International Journal of Production of Economics, 1991, 25, 5-12.
Jain, H.K. et al., “E-R Approach to Distributed Heterogeneous Database Systems for Integrated Manufacturing”,Information Resource Management Journal, 1992, 3(1), 21-29.
Jean-Luc, G., “Automated Shop Floor Control System and Method of Operation Thereof”,Patents Alert, 5530857, p. 87.
Naylor, A.W., et al., “Design of Integrated Manufacturing System Control Software”,IEEE Transactions on Systems, Man, and Cybernetics, 1987, SMC17-(6), 881-897.
Oreshin, K.P. et al., “Integrated Multilevel System for Control of Production of the KAMAZ Work Complex”,Soviet Journal of Instrumentation and Control, 1983, 4, 13-15.
Ouelhadj, D. et al., “A Multi-Contract Net Protocol for Dynamic Scheduling in Flexible Manufacturing Systems (FMS)”,Proceedings of the IEEE International Conference on Robotics&Automation, 1999, 1114-1119.
Patkai, B., “A Cooperative Scheduling System for Paper Machinery Manufacturing”,IEEE, 1998, 2518-2521.
Ramaswamy, S.E. et al., “Deadlock-Free Schedules for Automated Manufacturing Workstations”,IEEE Transactions on Robotics and Automation, 1996, 12(3), 391-400.
Roberts, P.D. et al., A Coordination Strategy for Integrated Operations Management and Control,Abstracts, 091, p. 1071.
Saad, A. et al., “Effectiveness of Dynamic Rescheduling in Agent-Based Flexible Manufacturing Systems”,SPIE, vol. 3203, 88-99.
Slomp, J. et al., “A Manufacturing Planning and Control System for a Flexible Manufacturing System”,Robotics&Computer-Integrated Manufacturing, 1993, 10(1/2), 109-114.
Zhu, L. et al., “FMS Job-Shop Scheduling Under Disruptions with Consideration of Time and Sequence Deviation”,Proceedings of the IEEE International Symposium on Intelligent Control/Intelligent Systems and Semiotics, 1999, 138-143.
“Integrated Manufacturing—A Challenge for the 1990s”, ESPRIT Consortium AMICE,Computing and Control Engineering Journal, 1991, 101-102.
K. Kachigan,Multivariate Statistical Analysis,A Conceptual Introduction, 2ndEdition, 1991.
David G.T. Denison, et al.,Bayesian Methods for Nonlinear Classification and Regression, 2002, John Wiley & Sons, Inc.
Cox, D., “Analyzing Transformer Test Data”.
Geromel, L. H. et al., “The Application of Intelligent Systems in Power Transformer Design”,Proceedings of the 2002 IEEE Canadian Conference on Electrical&Computer Engineering, 2002, 285-290.
Doulamis, N.D., et al., “A Synergetic Neural Network—Genetic Scheme for
Long Thomas E.
Smiley Karen J.
ABB Research Ltd.
Katterle Paul R.
Tsai Carol S. W.
Woodcock & Washburn LLP
LandOfFree
Transformer testing does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Transformer testing, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Transformer testing will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3613302