Boots – shoes – and leggings
Patent
1990-12-03
1993-03-09
Smith, Jerry
Boots, shoes, and leggings
364478, G06F 1546
Patent
active
051930650
ABSTRACT:
A system for requisitioning and distributing material in a manufacturing environment is provided. A manufacturing station stores and utilizes the material and produces a first missing resource signal in response to depleting a predetermined amount of the material in the manufacturing station. An intelligent storage unit stores the material. A computer system receives the first missing resource signal, responsively searches the storage unit, produces a material transfer command signal in response to the presence of the material, and produces a pull trigger signal in response to the absence of the material. A microcomputer produces a material schedule. A logic device receives the pull trigger signal and produces a depletion signal in response to the pull trigger signal and the material schedule.
REFERENCES:
patent: 4669047 (1987-05-01), Chucta
patent: 4827423 (1989-05-01), Beasley et al.
"Material Handling: Japan's Kanban vs. MRP II", Instruments and Control Systems, vol. 56, No. 3, Mar. 1983, Radnor, Pa., U.S., pp. 31-35, by J. B. Pujol.
"Informatique des Gestionnaires et Mini-Ordinateurs", Bulletin Scientific De L'Association De Ingenieurs Electriciens, vol. 88, Mar. 1975, Liege, Be, pp. 107-114, by L. Gicquello.
Magazine: Automotive Industries, Article: JIT VS. MRP: The Push-Pullers Call a Truce, by: D. Williams, Date: Jul., 1986, pp. 30-31.
Magazine: Modern Materials Handling, Article: How MRP II and JIT Work Together at DuPont, By: I. P. Krepchin, Date: Dec., 1986, pp. 73-76.
Paper: Trackless Requirements Planning-The Next Phase, By: W. A. Thurwachter et al., Date: Oct. 9-12, 1984, APICS 27th Conference, pp. 113-114.
Paper: Just-In-Time: A Goal for MRP II, By: W. E. Godard et al., Date: Oct. 9-12, 1984, APICS 27th Annual International Conference, pp. 149-151.
Advertisement, Actionline, vol. 9, Issue 7, Automotive Industry Action Group, Southfield, Mi., Jul. 1990 (Advertisement for Wagner Data Systems).
Seminar Session, Autotech '89, Detroit, Mi., Sep. 19-21, 1989, Electronic Kanban.
Magazine, Manufacturing Resource Planning, Article: Systems for Supporting the MRP/II/JIT Environment, By: A. Roa et al., Date: Summer, 1987 pp. 15-23.
Magazine, IE, Article: Implementing JIT with MRP II Creates Hybrid Manufacturing Environment, by: G. J. Bose et al., Date: Sep., 1988 pp. 49-53.
Book, Just-In-Time for America, Chapters 10 and 11, pp. 225-296, Written By: K. A. Wantuck, Published: 1989.
Book, World Class Manufacturing, The Lessons of Simplicity, Chapter 10, pp. 172-188, Written by: R. J. Schonberger, Published: 1986.
Barrow Jon E.
Guerindon Pierre C.
Caterpillar Inc.
Garland Steven R.
Masterson David M.
Smith Jerry
LandOfFree
System for requistioning and distributing material in a manufact does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with System for requistioning and distributing material in a manufact, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and System for requistioning and distributing material in a manufact will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-214343