ABSTRACT:

FIELD OF THE INVENTION
This invention relates to a system for monitoring a characteristic of a product and in particular to a system of monitoring a characteristic of concrete in a concrete testing process to thereby monitor the quality of supplied concrete.
BACKGROUND OF THE INVENTION
Presently, ready mixed concrete in produced at a batching plant and transported to a construction site by trucks. At the construction site, a sample of concrete is taken from one in about six trucks. The sample is subjected to the performance of a series of tests to monitor the quality of supplied concrete. The tests performed on a concrete sample are usually a slump test and a compression strength test. The sample of concrete is taken from the truck and wheelbarrowed into a “test cube making centre”.
A slump test is performed on the sample of concrete and the result is recorded manually into a log book. A slump test is a measure of concrete workability. The test is performed by filling a specially shaped metal cone with concrete to be tested, removing the metal cone so that the cone of concrete partially subsides or slumps, and measuring the change of height of the concrete from the height of the top of the cone to the height of the top of the slumped concrete pile. Generally speaking, the greater the change in height, the greater the workability of the concrete.
To prepare the concrete for compression strength testing, about six test cubes of dimension of 150×150×150 mm are made. Normally, three of the test cubes are stored for seven days while three are stored for twenty-eight days. In the current system, when the test cubes are made, a written paper note which includes information such as the date the test cube was made, the grade of concrete, the test cube number and what load of concrete the test cube came from, is placed on top of the test cube while the test cube is still wet. The next day, when the concrete has cured, the mould used for making the concrete test cube is removed and the information from the note attached to the test cube is transcribed to the side of the test cube using a crayon or permanent marker.
After storing the test cubes for an appropriate number of days, the test cubes are tested for their compression strength and their measurements are recorded manually into the log book which contains the slump test results. In most cases, after the compression strength test is conducted, the test results are also manually entered into a computerised database.
Occasionally when the requirements for the concrete deviate from normal, adjustments are made to the testing conditions. For example, the test cube dimensions may need to be changed to 100×100×100 mm. In addition to the standard seven day and twenty-eight day compression strength tests, the test cubes might need to be tested for their two day, three day and/or fifty-six day strength. In this case, additional test cubes will need to be made for testing.
There a number of problems with the current testing system. Firstly, due to the manner in which information is recorded, information relating to the test results can be lost or interfered with. For example, as discussed above, information in recorded on paper notes which are placed on the concrete test cubes. While the information is usually written using a permanent marker, the data can be smudged or become faded if the note gets wet or dirty. Concrete test cubes are often submerged in water as part of the curing process adding to the likelihood of data being lost on other occasions, the note can become detached from the test cube and it is not always be possible to match a detached note to a particular test cube. Particularly, if more than one note becomes detached at the same time. As a result, when data identifying the test cube needs to be transferred onto the side of the test cube, the data can be distorted or lost.
Other errors arise due to errors in the transcription of data from the notes to the sides of the test cube.
Even if the data is transcribed accurately from the note to the side of the cube, it is possible for the writing on the side of the cube to become smudged or at least degraded sufficiently to make it hard to read to recover the data.
Furthermore, it is easy to tamper with the information on the note or on the side of the cube or when it is being entered into the log book. Thus, data might be changed in order to meet safety standards or to cut costs.
Further errors arise due to manual recording of the test cube data, slump tests and compression strength test results and also when the information is transferred from the log book to the computerised database. To attempt to improve the accuracy of the data it is often necessary for the data to be double checked which can consume time and increase the cost of the process.
Furthermore, in the current system it is necessary for both a client representative and a contractor to be present to witness the compression strength test. This is extremely resource intensive.
A further problem is that because of the delay between recording the data into a log book and transferring the data onto a computer database, the database is not readily accessible from the computerised database in a reasonable time frame for analytical purposes. Occasionally, the time is often increased because contractors tend to misplace log-books.
The above mentioned problems can have serious consequences in relation to monitoring the quality of concrete. It will be understood that it is important to ensure that concrete is of sufficient quality because there are potentially serious ramifications for the structure made from the concrete if the quality is inadequate. For example, if a compression strength test indicates that a particular batch of concrete is flawed to the extent that it may cause problems in the finished structure which employs the concrete, then it is important that such a result can be related to where the concrete has been used in the actual structure. If information relating to the particular test cube is lost or incorrect, it may not be possible to make this connection or the connection which is made may not be correct. Furthermore, as the current system requires manual entry of data, it is possible for the person entering the data to interfere with it and modify the test results when they do not meet safety criteria.
Embodiments of the present invention attempt to address the foregoing problems and at least to provide a system which is improved compared to the current system.
DISCLOSURE OF THE INVENTION
The invention provides a system for monitoring a characteristic of a product in a testing process, said system including:
an information storage device for storing information relating to said product, said information storage device being separate from said product and adapted to be affixed to said product;
writing means for writing said information to said information storage device;
reading means for reading said information from said information storage device and storing said information in a database; and
test means for performing a test on said product to produce a test result and storing said test result in said database so that it is associated with said information, whereafter the associated information and test result stored in said database enable monitoring of the characteristic of the product.
Preferably, said product is produced at a first location and transported to a second location before said information storage device is affixed to said product.
Preferably, said product is transported to said second location together with identification data associated with said product, and wherein said identification data is inputted to a memory of said writing means at said second location, said identification data being subsequently written to said information storage device by said writing means as at least part of said information.
Preferably, a preliminary test is conducted on said product at said second location and a preliminary test result of said preliminary test is inputted to said w

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

System for monitoring a characteristic of a product does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with System for monitoring a characteristic of a product, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and System for monitoring a characteristic of a product will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3324402

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.