Data processing: structural design – modeling – simulation – and em – Structural design
Reexamination Certificate
2011-04-12
2011-04-12
Jacob, Mary C (Department: 2123)
Data processing: structural design, modeling, simulation, and em
Structural design
C299S019000
Reexamination Certificate
active
07925474
ABSTRACT:
The present invention relates to the field of extracting resource(s) from a particular location. In particular, the present invention relates to the planning, design and processing related to a mine location in a manner based on enhancing the extraction of material considered of value, relative to the effort and/or time in extracting that material. The present application discloses, amongst other things, a method of and apparatus for determining the removal of material(s) from a location, determining the removal of material(s) of a differing relative value from a location, determining a schedule corresponding to a risk and/or return basis, determining aggregated block ordering for the extraction of material from a location, determining a schedule for extraction of dumps and determining a mine design.
REFERENCES:
patent: 3692364 (1972-09-01), Henriksson et al.
Hochbaum et al, “Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem”, Department of Industrial Engineering and Operations Research, University of California at Berkley, Jan. 16, 1998.
Gershon, Mark, “Heuristic Approaches for Mine Planning and Production Scheduling”, International Journal of Mining and Geological Engineering, 1987, 5, pp. 1-13.
Bezdek, James C. et al., “Convergence Theory for Fuzzy c-Means: Counterexamples and Repairs”,IEEE Transactions on Systems, Man, and Cybernetics, vol. SMC-17, No. 5 pp. 873-877, Sep./Oct. 1987.
Brealey, S.C. et al., “Opencast Mining”,The Mining Engineer, I.M.E.(UK), No. 99, pp. 147-163, Dec. 1968.
Caccetta, Louis et al., “An Application of Branch and Cut to Open Pit Mine Scheduling”, http://ructor.rutgers.edu/˜do99/EA/SHill.doc, pp. 1-24, 1999.
International Search Report for PCT/AU03/01298, dated Nov. 7, 2003.
International Search Report for PCTAU03/01299, dated Nov. 11, 2003.
Kaas, L. Michael, “Computer Techniques for Production Scheduling and Blending of Taconite”Proceedings of the 26thAnnual Mining Symposium, University of Minnesota, pp. 135-144, Jan. 1965.
Lerchs, Helmut et al., Optimum Design of Open-Pit Mines,Transactions, C.I.M., vol. LXVII, pp. 17-24, 1965.
Pana, M.T., “The Simulation Approach to Open-Pit Design”,Transactions of the Short Course and Symposium on Computers and Computer Applications in Mining and Exploration, University of Arizona, pp. 1-24, Mar. 1965.
Underwood, R. et al., “A Mathematical Programming Viewpoint for Solving the Ultimate Pit Problem”,EJOR, vol. 107 pp. 96-107, 1998.
Wharton, Christopher et al., “The Effect of Mining Width on NPV”,Proceedings of the 1997 Whittle Conference “Optimizing with Whittle”, Perth, Western Australia, pp. 174-178, Apr. 1997.
Froyland Gary Allan
Menabde Merab
BHP Billiton Innovation Pty Ltd.
Brinks Hofer Gilson & Lione
Jacob Mary C
Nichols G. Peter
LandOfFree
System and methods(s) of blended mine planning, design and... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with System and methods(s) of blended mine planning, design and..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and System and methods(s) of blended mine planning, design and... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2640578