System and method for pull-in order planning and control

Data processing: generic control systems or specific application – Specific application – apparatus or process – Product assembly or manufacturing

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C700S095000

Reexamination Certificate

active

06920365

ABSTRACT:
A system for planning and controlling a pull-in request of an order with demanded capacity in a production system. A plan engine is programmed to receive a pull-in request for the order, release original demanded capacity, reserve a capacity for the pull-in order, and generate a fixed production schedule for the pull-in order based on a capacity model that considers a plurality of capacity vectors in the production system. A production schedule monitor and evaluation module determines whether the relevant current pull-in order conforms to the fixed production schedule and whether to adjust the fixed production schedule when the relevant current pull-in order deviates from the fixed production schedule.

REFERENCES:
patent: 6415195 (2002-07-01), Gleditsch et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

System and method for pull-in order planning and control does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with System and method for pull-in order planning and control, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and System and method for pull-in order planning and control will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3369867

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.