System and method for generating a schedule based on...

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Health care management

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Reexamination Certificate

active

07379888

ABSTRACT:
A system for generating a schedule by generating assignments for the tasks of a project and sequentially scheduling the individual assignments to available resources. First, input information is received which includes a resource calendar and a task list. A resource calendar identifies the resources available to work on a project and any constraints that are associated with the resources. A task list identifies the tasks that must be performed and any constraints that are associated with the tasks. At a minimum, the constraints associated with the tasks must identify each of the resources assigned to the task, and the work-amount that each resource must perform. Next, assignments are generated for each of the tasks. Each of the assignments identifies a specific resource and the work-amount required by the specific resource. Finally, each of the assignments are scheduled in accordance with the provided resource constraints identified in the resource calendar. The resulting schedule maximizes the utilization of the resources by scheduling on an assignment basis. The assignments are individually scheduled into the next available time-slot of the resources, thus, eliminating idle time where a resource is under-utilized.

REFERENCES:
patent: 4937743 (1990-06-01), Rassman et al.
patent: 5111391 (1992-05-01), Fields et al.
patent: 5255181 (1993-10-01), Chapman et al.
patent: 5291394 (1994-03-01), Chapman
patent: 5406476 (1995-04-01), Deziel et al.
patent: 5408663 (1995-04-01), Miller
patent: 5630070 (1997-05-01), Dietrich et al.
patent: 5649113 (1997-07-01), Zhu et al.
patent: 5671361 (1997-09-01), Brown et al.
patent: 5737498 (1998-04-01), Murray
patent: 5787283 (1998-07-01), Chin et al.
patent: 5878416 (1999-03-01), Harris et al.
patent: 5884276 (1999-03-01), Zhu et al.
patent: 5893074 (1999-04-01), Hughes et al.
patent: 5897629 (1999-04-01), Shinagawa et al.
patent: 6052707 (2000-04-01), D'Souza
patent: 6216109 (2001-04-01), Zweben et al.
patent: 2001/0023439 (2001-09-01), Miyazaki
Heck, Mike, High-end project managers, Infoworld, vol. 15, n5, pp. 59-70, Feb. 1, 1993.
Woodworth, Bruce, A statistical evaluation of the impact of limited resources on project scheduling. Cost Engineering, v35, n2, pp. 25-32, Feb. 1993.
McDonald, Donald F., Jr., Software Review- Texim v1.1, Cost Engineering, v34n4, pp. 25-26, Apr. 1992.
Martin, Daniel J, Cost/schedule systems for utility engineering organization. Cost Engineering, v36n6, pp. 29-34, Jun. 1994.
Project Management: on time and on budget. King, Nelson H., PC magazine, v14, n7, p. 165 (6), Apr. 11, 1995.
New tools for old need. Heck, Mike and Youn, Tom. InfoWorld, v16, n40, pp. 68-83, Oct. 3, 1994.
Heck, Mike, “New tools for old need.” InfoWorld, vol. 16, N. 40, pp. 68-83.
Martin, Daniel, “Cost/Schedule systems for a utility engineering organization,” Cost Engineering, vol. 36, N. 5, pp. 29-34.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

System and method for generating a schedule based on... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with System and method for generating a schedule based on..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and System and method for generating a schedule based on... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3986996

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.