Subterranean connecting method for construction of shield tunnel

Hydraulic and earth engineering – Underground passageway – e.g. – tunnel – Boring

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

405141, 405142, 405147, 4051501, E21D 906

Patent

active

052211606

DESCRIPTION:

BRIEF SUMMARY
BACKGROUND OF THE INVENTION

The present invention relates to a subterranean connecting method for construction of a shield tunnel and a connecting apparatus therefor, in which two tunnel sections are excavated by the use of two shield machines simultaneously from the two tunnel sections, and the two tunnel sections are connected to each other to form the single tunnel.
Conventionally, a subterranean connecting method for construction of a shield tunnel of this kind has been known as shown in FIG. 32.
In FIG. 32, the reference character G denotes the ground in the vicinity of a connecting area between two tunnel sections which are excavated from both sides of a shield tunnel. A shield machine 1, which is located on the right side in the drawing sheet and has excavated one tunnel section T.sub.a, and a shield machine 2, which is located on the left side and has excavated the other tunnel section T.sub.b, face toward each other with the ground G.sub.i having a predetermined spacing (of the order of about 30 cm) remaining. The tunnel sections T.sub.a and T.sub.b formed in rear of the respective shield machines 1 and 2 have their respective wall surfaces which are covered respectively with segments 3a, 3a, . . . and 3b, 3b, . . . . A plurality of boring-type freezing tubes 4a and 4b are arranged within the ground G at the forward ends of the respective shield machines 1 and 2. The boring-type freezing tubes 4a and 4b are arranged at a predetermined inclined angle (a=17.degree.-25.degree.) with respect to skin plates 1a and 2a and at a predetermined pitch in the peripheral direction. Plastered freezing tubes (not shown) are also arranged on the entire inner peripheral surfaces of the respective skin plates 1a and 2a and the segments 3a and 3b at the foremost locations.
Brine (cooling liquid) is circulated through the boring-type freezing tubes 4a and 4b arranged at the skin plates 1a and 2a and through the plastered freezing tubes, whereby the ground G.sub.f at the outer peripheries of the respective skin plates 1a and 2a is frozen so as to surround the ground G.sub.i. Subsequently, the front sections 5a and 5b of the respective shield machines 1 and 2 are disassembled The ground G.sub.i remaining between the shield machines 1 and 2 is then excavated, and the wall surface of the ground G.sub.i is covered, whereby two tunnel sections T.sub.a and T.sub.b excavated from the left- and right sides are connected to each other. Thus, the shield tunnel is completed.
However, the conventional subterranean connecting method for construction of the shield tunnel has the following drawbacks. First, water sealing and protection against soil collapse are not complete resulting in less safety as both shield machines do not contact to each other forming a gap of normally about 30 cm. Further, a freezing method of construction, which is chiefly employed as an auxiliary method of construction, requires much cost of construction and a long construction time. The strength of frozen ground is reduced due to the mixing of salinity specially in case of the construction under the sea bed. There is an effect or influence of expansion of the frozen ground at freezing and the subsidence of ground at thawing. Control or management of the frozen ground is difficult.


SUMMARY OF THE INVENTION

The invention has been done in view of the above problems, and the object of the invention is to provide a subterranean connecting method for construction of a shield tunnel and a connecting apparatus therefor, which secure water retarding against soil and water pressure acting upon the vicinity of a tunnel connecting section from the ground G in the vicinity of the connecting section so that construction can be done safely, and which can considerably reduce the cost of construction and the construction time required for the connection of tunnels.
In order to achieve the above object, the invention provides a subterranean connecting method for construction of a shield tunnel, comprising the step of excavating two tunnels by a set of shield machines a

REFERENCES:
patent: 3919851 (1975-11-01), Plourde
patent: 4432667 (1984-02-01), Richardson
patent: 5051033 (1991-09-01), Grotenhofer

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Subterranean connecting method for construction of shield tunnel does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Subterranean connecting method for construction of shield tunnel, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Subterranean connecting method for construction of shield tunnel will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1437728

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.