ABSTRACT:
BACKGROUND OF THE INVENTION
The present invention relates to drilling systems and operations. More particularly, the present invention is a method and system for handling formation fluids entering the wellbore in the form of a hydrocarbon gas during well events.
Drilling fluids, also known as muds, cool the drill bit, flush the cuttings away from the bit's formation interface and then out of the system, and stabilize the borehole with a “filter cake” until newly drilled sections are cased. The drilling fluid also performs a crucial well control function and is monitored and adjusted to maintain a pressure with a hydrostatic head in uncased sections of the borehole that prevents the undesired flow of pressured well fluids into the borehole from the formation during drilling operations, i.e., well control events.
Conventional offshore drilling circulates drilling fluids down the drill string and returns the drilling fluids with entrained cuttings through an annulus between the drill string and the casing below the mudline. A riser surrounds the drill string starting from the wellhead at the ocean floor to drilling facilities at the surface and the return circuit for drilling mud continues from the mudline to the surface through the riser/drill string annulus.
In this conventional system, the relative weight of the drilling fluid over that of seawater and the length of the riser in deepwater applications combine to exert an excess hydrostatic pressure in the riser/drill string annulus.
Systems have been conceived to bring the drilling fluid and entrained cuttings out of the annulus at the base of the riser and to deploy a subsea pump to facilitate the return flow through a separate line. One such system is disclosed in U.S. Pat. No. 4,813,495 issued Mar. 21, 1989 to Leach. That system requires complex provisions to ensure the closely synchronous operation of the supply and return pumps critical to the approach disclosed. However, the durability and dependability of such a mud circulation system is suspect in the offshore environment and particularly so in light of the incompatibility of the fluid with pumping operations following a well control event.
Thus, there remains a need for technology facilitating subsea pump operation for the return of drilling fluid to the surface.
A SUMMARY OF THE INVENTION
One aspect of the present invention is a subsea gas separation system for use in drilling an offshore well in which a subsea blowout preventor is connected to the well and a gas separator is connected to the blowout preventor near the seafloor. Gas released into the well bore during a well control event is removed at the separator and not returned with the drilling mud recirculated to the surface.
Another aspect of the present invention is a method for offshore drilling in which a mud circulation circuit is established leading down the drill string, through the drill bit, up the borehole, through a subsea pump, and to the surface through a return riser. The subsea pump is protected during critical well control events by removing gas released into the mud at a gas separator located upstream of the subsea pump and in communication with the blowout preventor.
REFERENCES:
patent: 3498674 (1970-03-01), Matthews
patent: 3603409 (1971-09-01), Watkins
patent: 3754380 (1973-08-01), McMinn et al.
patent: 3769521 (1973-10-01), Calswell et al.
patent: 3815673 (1974-06-01), Bruce et al.
patent: 4063602 (1977-12-01), Howell et al.
patent: 4091881 (1978-05-01), Maus
patent: 4147221 (1979-04-01), Ilfrey et al.
patent: 4149603 (1979-04-01), Arnold
patent: 4253530 (1981-03-01), Sharki et al.
patent: 4295366 (1981-10-01), Gibson et al.
patent: 4326859 (1982-04-01), Burnham, Sr.
patent: 4326863 (1982-04-01), Day et al.
patent: 4365977 (1982-12-01), Egbert
patent: 4381191 (1983-04-01), Brand et al.
patent: 4397659 (1983-08-01), Gowan et al.
patent: 4430892 (1984-02-01), Owings
patent: 4495999 (1985-01-01), Sykora
patent: 4506735 (1985-03-01), Chaudot
patent: 4527632 (1985-07-01), Chaudot
patent: 4687066 (1987-08-01), Evans
patent: 4691789 (1987-09-01), Richards et al.
patent: 4705114 (1987-11-01), Schroeder et al.
patent: 4813495 (1989-03-01), Leach
patent: 4867254 (1989-09-01), Gavignet
patent: 4982794 (1991-01-01), Houot
patent: 5085277 (1992-02-01), Hopper
patent: 5417544 (1995-05-01), Mohn
patent: 5460227 (1995-10-01), Sidrim
patent: 5827357 (1998-10-01), Farion
patent: 5975219 (1999-11-01), Sprehe
patent: 6062313 (2000-05-01), Moore
Allen Gault, “Riserless drilling: circumventing the size/cost cycle in deepwater,”Offshore, May 1996, 4 pp.
Rick von Flatern, “Rig rates must keep reaching,”Offshore, Feb. 1997, 1 p.
Larry Comeau, Integrating surface systems with downhole data improves underbalanced drilling,Oil&Gas Journal, Mar. 3, 1997, OGJ Special, 56-67.
Steven S. Bell, “Riserless drilling promising for deepwater developments,”World Oil, May 1997, 1 p.
“Riserless Drilling Project Develops Critical New Technology/Deepwater Technology Symposium”, by Robert E. Snyder, World Oil, pp. 1-11, Dec. 1997.
“Riserless Drilling: Circumventing the size/cost cycle in deepwater”, by Allen Gault, Drilling Technology, pp. 1-4, undated.
“Subsea Mudlift Drilling JIP: Achieving daul gradient technology”, by K. L. Smith et al., Deepwater Technology, pp. 21-28, Aug. 1999.
“Riserless Drilling and Well Control for Deep Water Applications”, by Jongguen Choe et al., pp. 1-9. presented at Deep Water Well Control Conference Sep. 15-16, 1997.
“Mudlift Drilling System Operations”, by Riley Goldsmith, pp. 1-9, presented at the OTC Conference on May 4-7, 1998.
“‘Riserless’ rivals rally to the cause”, Offshore Engineer, Apr. 2000, pp. 20-23.
“Shell moves forward with dual gradient deepwater drilling solution”, Willaim Furlow, Offshore, Mar. 2000, pp. 95-96.
“Riserless Drilling JIP/Conceptual Engineering” Jul. 30, 1997, Deepwater Drilling Workshop, MMS-LSU (Baton Rouge).
Bagnell David
Lee Jong-Suk
Shell Offshore Inc.
LandOfFree
Subsea gas separation system and method for offshore drilling does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Subsea gas separation system and method for offshore drilling, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Subsea gas separation system and method for offshore drilling will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2514596