Structured approach for risk-informing deterministic safety...

Data processing: structural design – modeling – simulation – and em – Simulating nonelectrical device or system

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C703S002000, C703S007000, C376S249000, C376S250000, C702S185000

Reexamination Certificate

active

10064191

ABSTRACT:
A risk-informed method for safety analyses of nuclear power generating systems is provided. In an exemplary embodiment, the method includes ordering events by an initiating event frequency, defining an initiating event frequency threshold value, defining acceptance criteria having an adjusted amount of conservatism, where the amount of conservatism is a function of the initiating event frequency, and analyzing an event by a deterministic safety analysis methodology when the event has an event initiating frequency at or above the threshold value, or analyzing an event by a probabilistic risk assessment methodology when the event has an event initiating frequency below the threshold value.

REFERENCES:
patent: 4632802 (1986-12-01), Herbst et al.
patent: 5970437 (1999-10-01), Gorman et al.
patent: 6697447 (2004-02-01), Casillas et al.
patent: 6772128 (2004-08-01), Radigan
patent: 6785636 (2004-08-01), Darken et al.
patent: 6799124 (2004-09-01), Perdue et al.
patent: 2002/0031200 (2002-03-01), Metell
patent: 2004/0013220 (2004-01-01), Casillas et al.
Official Transcript of Proceedings, U.S. Nuclear Regulatory Commission, Apr. 12, 2002. http://www.nrc.gov/reading-rm/doc-collections/acrs/tr/fullcommittee/2002/ac020412.html.
Miller, D.W. et. al. “Dynamic Safety in BWR Plant Safety Systems.” IEEE Transactions on Nuclear Science. Aug. 1995, vol. 42, Issue 4, pp. 975-981.
Turso, J.A. et al. “Kalman Filter-Based Maximum A Posteriori Probability Detection of Boiling Water Reactor Stability”. IEEE Transactions on Control Systems Stability. Sep. 2004. vol. 12, Issue 5, pp. 750-756.
Youngborg, L.H. “Retrofits to BWR Safety and Non-Safety Systems Using Digital Technology.” IEEE Nuclear Science Symposium and Med. Imaging Conf. Oct. 31, 1992. vol. 2, pp. 724-726.
Ross, M.A. et al. “Control Room Design and Automation in the Advanced BWR.” IEEE Nuclear Science Symposium. Oct. 22-27, 1990. pp. 954-960.
Taggart Rogers, S. et al. “Automated Production and Maintenance of BWR Emergency Operation Procedures.” IEEE 5th Conf. on Human Factors and Power Plants. Jun. 11, 1992. pp. 160-166.
Andersen, V.M. et al. “Human Error Probability Models in the BWR Individual Plant Evaluation Model.” IEEE 4th Conf. on Human Factors and Power Plants. Jun. 9, 1988. pp. 323-342.
Kakehi, A. et al. “Microprocessor-Based Fault-Tolerant Reactor Control and Information System.” IEEE Transactions on Energy Conversion. Mar. 1990, vol. 5, Issue 1, pp. 52-57.
Hucik, S.A. “Advanced Boiling Water Reactor, The Next Generation: Status and Future.” IEEE Nuclear Science Symposium and Medical Imaging Conf. Nov. 9, 1991. vol. 2, pp. 1377-1382.
Fukazaki, T. et al. “Knowledge-Based System for Core Operation Management of Boiling Water Reactors.” Proc. of the Int'l Workshop on Artificial Intelligence for Industrial Applications. May 27, 1998. pp. 143-148.
Kobayashi, Y. et al. “Optimization of Boiling Water Reactor Loading Pattern Using an Improved Genetic Algorithm.” Proc. of the 2001 IEEE Int'l Symposium on Intelligent Control. Sep. 2001, pp. 383-390.
McCalley, J.D. et al. “An Overview of Risk-Based Security Assessment.” IEEE Power Engineering Society Summer Meeting. Jul. 1999. vol. 1. pp. 173-178.
Poulter, Susan. “Monte Carlo Simulation in Environmental Risk Assessment—Science, Policy and Legal Issues.” Risk: Health, Safety & Environment. vol. 9, Winter 1998. http://www.piercelaw.edu/risk/vol9/winter/Poulter.pdf.
Nuclear Energy Institute, “Nuclear Power Plant Regulation.” Oct. 2001. http://www.nei.org/documents/Status—Report—Regulation.pdf.
Gurpinar, A. et al. “Global Blueprints for Change: Living with Natural and Technological Hazards.” International Workshop on Disaster Reduction. Aug. 19-22, 2001. http://www.gadr.giees.uncc.edu/DOCS/Theme—A—sent—out/ . . . .
Framework for Risk-Informed Changes to the Technical Requirements of 10 CFR 50, Aug. 2000, Office Of Nuclear Regulatory Research, Division Of Risk Analysis And Applications, Probabilistic Risk Analysis Branch, pp. i-ii; 1-1 to 1-3; 2-1 to 2-5; 3-1 to 3-7; 4-1 to 4-6; 5-1 to 5-12, 6-1; 7-1; Appendix A, A-1 to A-6.
Framework for Risk-Informed Changes to the Technical Requirements of 10 CFR 50, Dec. 10, 2001, John Gaertner EPRI, pp. 1-4.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Structured approach for risk-informing deterministic safety... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Structured approach for risk-informing deterministic safety..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Structured approach for risk-informing deterministic safety... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3744411

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.