Static structures (e.g. – buildings) – With component having discrete prestressing means – Anchorage
Reexamination Certificate
1999-05-23
2001-01-23
Stephan, Beth A. (Department: 3635)
Static structures (e.g., buildings)
With component having discrete prestressing means
Anchorage
C052S223110, C403S305000, C403S374100
Reexamination Certificate
active
06176051
ABSTRACT:
TECHNICAL FIELD
The present invention relates to post-tensioning systems. More particularly, the present invention relates to post-tensioning systems having intermediate anchorages. Furthermore, the present invention relates to sealing devices for preventing liquid intrusion into the exposed sections of tendon in the post-tension system.
BACKGROUND ART
For many years, the design of concrete structures imitated the typical steel design of column, girder and beam. With technological advances in structural concrete, however, its own form began to evolve. Concrete has the advantages of lower cost than steel, of not requiring fireproofing, and of its plasticity, a quality that lends itself to free flowing or boldly massive architectural concepts. On the other hand, structural concrete, though quite capable of carrying almost any compressive load, is weak in carrying significant tensile loads. It becomes necessary, therefore, to add steel bars, called reinforcements, to concrete, thus allowing the concrete to carry the compressive forces and the steel to carry the tensile forces.
Structures of reinforced concrete may be constructed with load-bearing walls, but this method does not use the full potentialities of the concrete. The skeleton frame, in which the floors and roofs rest directly on exterior and interior reinforced-concrete columns, has proven to be most economic and popular. Reinforced-concrete framing is seemingly a quite simple form of construction. First, wood or steel forms are constructed in the sizes, positions, and shapes called for by engineering and design requirements. The steel reinforcing is then placed and held in position by wires at its intersections. Devices known as chairs and spacers are used to keep the reinforcing bars apart and raised off the form work. The size and number of the steel bars depends completely upon the imposed loads and the need to transfer these loads evenly throughout the building and down to the foundation. After the reinforcing is set in place, the concrete, a mixture of water, cement, sand, and stone or aggregate, of proportions calculated to produce the required strength, is placed, care being taken to prevent voids or honeycombs.
One of the simplest designs in concrete frames is the beam-and-slab. This system follows ordinary steel design that uses concrete beams that are cast integrally with the floor slabs. The beam-and-slab system is often used in apartment buildings and other structures where the beams are not visually objectionable and can be hidden. The reinforcement is simple and the forms for casting can be utilized over and over for the same shape. The system, therefore, produces an economically viable structure. With the development of flat-slab construction, exposed beams can be eliminated. In this system, reinforcing bars are projected at right angles and in two directions from every column supporting flat slabs spanning twelve or fifteen feet in both directions.
Reinforced concrete reaches its highest potentialities when it is used in pre-stressed or post-tensioned members. Spans as great as one hundred feet can be attained in members as deep as three feet for roof loads. The basic principle is simple. In pre-stressing, reinforcing rods of high tensile strength wires are stretched to a certain determined limit and then high-strength concrete is placed around them. When the concrete has set, it holds the steel in a tight grip, preventing slippage or sagging. Post-tensioning follows the same principle, but the reinforcing tendon, usually a steel cable, is held loosely in place while the concrete is placed around it. The reinforcing tendon is then stretched by hydraulic jacks and securely anchored into place. Pre-stressing is done with individual members in the shop and post-tensioning as part of the structure on the site.
In a typical tendon tensioning anchor assembly used in such post-tensioning operations, there are provided anchors for anchoring the ends of the cables suspended therebetween. In the course of tensioning the cable in a concrete structure, a hydraulic jack or the like is releasably attached to one of the exposed ends of each cable for applying a predetermined amount of tension to the tendon, which extends through the anchor. When the desired amount of tension is applied to the cable, wedges, threaded nuts, or the like, are used to capture the cable at the anchor plate and, as the jack is removed from the tendon, to prevent its relaxation and hold it in its stressed condition.
There are many post-tension systems employing intermediate anchorages where the length of the slab is too long to tension with a single anchor. In these systems, the intermediate anchor is interposed between a live end and a dead end anchor. In the construction of such intermediate anchorage systems, the tendon extends for a desired length to the intermediate anchor. A portion of the sheathing is removed in the vicinity of the intermediate anchor. The intermediate anchor is installed onto a form board in accordance with conventional practice. The unsheathed portion of the tendon is received by a tensioning apparatus such that the tendon is stressed in the area between the dead end anchor and the intermediate anchor. After- stressing the tendon, concrete is poured over the exterior of the sheathed tendon and over the dead end anchor and intermediate anchor. The remaining portion of the tendon extends from the intermediate anchor to either another intermediate anchorage or to the live end anchor. Intermediate anchorage systems are employed whenever the slab is so long that a single live anchor extending to a single dead end anchor is inadequate. For example, two intermediate anchorages would be used for slabs having a length of approximately 300 feet.
A problem that affects many of the intermediate anchorage systems is the inability to effectively prevent liquid intrusion into the unsheathed portion of the tendon. Normally, the unsheathed portion will extend outwardly, for a distance, from the intermediate anchor in the direction toward the dead end anchor. Additionally, another unsheathed portion will extend outwardly at the intermediate anchor toward the live end anchor. In normal practice with a single live anchor and without intermediate anchors, a liquid-tight tubular member is placed onto an end of the anchor so as to cover the unsheathed portion of the tendon. This is relatively easy to accomplish since the length of the tendon is minimal at the live end. However, it is a considerable burden to attempt to slide such a tubular member along the entire length of the tendon so as to form the liquid-tight seal at the intermediate anchorage. In normal practice, tape, or other corrosion protection materials, are applied to the exposed portion of the tendon adjacent the intermediate anchorage. Extensive practice with this technique has shown that it is generally ineffective for preventing liquid intrusion into the interior of the tendon or into the interior of the intermediate anchorage. As such, a great need has developed in which to protect the exposed areas of the tendon adjacent the intermediate anchorage.
A problem inherent in such continuous tendon intermediate anchorage systems is the difficulty of installation. Conventionally, in order to install the great lengths of tendon associated with such an intermediate anchorage systems, it is necessary for the worker at the construction site to thread the anchor along the length of the tendon so as to place the anchor in a desired position. Often during this “threading” of the anchor onto the tendon, nicks and damage can occur to the sheathing on the tendon. Often, components of the intermediate anchorage system are omitted or the installation is carried out in an ineffective manner because of the large amount of manual manipulation that is required for the installation of the system. Inherently, each of the intermediate anchors will be located in a joint of the concrete structure. As such, each of the anchors will be exposed to the corroding elements in this location. The liquid res
Glessner Brian E.
Harrison & Egbert
Stephan Beth A.
LandOfFree
Splice chuck for use in a post-tension anchor system does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Splice chuck for use in a post-tension anchor system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Splice chuck for use in a post-tension anchor system will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2463889