Active solid-state devices (e.g. – transistors – solid-state diode – Combined with electrical contact or lead – Of specified material other than unalloyed aluminum
Patent
1996-04-24
1999-03-16
Williams, Alexander Oscar
Active solid-state devices (e.g., transistors, solid-state diode
Combined with electrical contact or lead
Of specified material other than unalloyed aluminum
257763, 257764, 257765, 257751, 257775, H01L 2348, H01L 2940
Patent
active
058834338
ABSTRACT:
Disclosed is a semiconductor device, which has: a wiring corresponding to a critical path, a wiring delay time of which determines an operating speed of an entire circuity, and a wiring corresponding to other than the critical path. The critical path wiring the other wiring are formed on the same wiring layer, wherein a thickness of at least a part of the critical path wiring is greater than that of the other wiring.
REFERENCES:
patent: 5034779 (1991-07-01), Tomita et al.
patent: 5045916 (1991-09-01), Von et al.
patent: 5083188 (1992-01-01), Yamagata
patent: 5084412 (1992-01-01), Nakasaki
patent: 5196916 (1993-03-01), Ishigami et al.
patent: 5220199 (1993-06-01), Owada et al.
patent: 5294836 (1994-03-01), Kishi
patent: 5309015 (1994-05-01), Kuwata et al.
patent: 5317193 (1994-05-01), Watanabe
patent: 5321650 (1994-06-01), Kikuzhi et al.
patent: 5429995 (1995-07-01), Nishiyama et al.
patent: 5477074 (1995-12-01), Yen
patent: 5479053 (1995-12-01), Oda
patent: 5500559 (1996-03-01), Mirata et al.
patent: 5502335 (1996-03-01), Oda
patent: 5532516 (1996-07-01), Pasch et al.
patent: 5604380 (1997-02-01), Nishmura et al.
N. Oda et al., "New Wiring Deisgn Concept for Reducing Wiring Resistance Effect in ECL Circuits", IEEE 1990 Bipolar Circuits and Technology Meeting, pp. 140-143.
M. Bohr et al, "A High Performance 0.35 um Logic Technology for 3.3V and 2.5V Operation", IEDM 94, pp. 273-276.
NEC Corporation
Williams Alexander Oscar
LandOfFree
Semiconductor device having a critical path wiring does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Semiconductor device having a critical path wiring, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Semiconductor device having a critical path wiring will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-820171