Semiconductor apparatus for monitoring critical path delay...

Miscellaneous active electrical nonlinear devices – circuits – and – Specific signal discriminating without subsequent control – By presence or absence pulse detection

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C714S700000

Reexamination Certificate

active

10713365

ABSTRACT:
A semiconductor apparatus for flexibly and effectively configuring a delay monitor circuit without an increase in circuit scale includes a delay signal generation circuit for switching the configuration of delay element arrays based on first configuration information and second configuration information and propagating a delay element array wherein a pulse is switched, a register group having a first register for the first configuration information and a second register for second configuration information, a selector for outputting to the delay signal generation circuit the first configuration information and second configuration information in accordance with an instruction of a selection signal in a time sharing way, and a control circuit for controlling a power source voltage based on delay information of a delay element array and outputting to the selector a selection signal to select from the first configuration information and second configuration information in a time sharing way.

REFERENCES:
patent: 6629250 (2003-09-01), Kopser et al.
patent: 6944801 (2005-09-01), Kojima

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Semiconductor apparatus for monitoring critical path delay... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Semiconductor apparatus for monitoring critical path delay..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Semiconductor apparatus for monitoring critical path delay... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3794449

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.