Selective completion system for downhole control and data...

Wells – Processes – Parallel string or multiple completion well

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C166S369000, C166S242600

Reexamination Certificate

active

08037938

ABSTRACT:
A completion system including a packer disposed in a wellbore and a tubular string having a bore therethrough configured to land into the packer. The tubular string includes an alignment sub, a seal assembly disposed below the alignment sub and having at least two longitudinal bores disposed through the seal assembly and offset from the bore of the tubular string. The tubular string also includes a sleeve sub disposed below the seal assembly, wherein the sleeve sub allows fluid communication between a bore of the tubular string and an annulus formed between the tubular string and the wellbore. The tubular string also includes at least two control lines operatively connected to the sleeve sub, wherein the at least two control lines are run through he at least two longitudinal bores of the seal assembly.

REFERENCES:
patent: 6983795 (2006-01-01), Zuklic et al.
patent: 7428932 (2008-09-01), Wintill et al.
patent: 7543647 (2009-06-01), Walker
Schlumberger “TRFC-HN AP and TRFC-HN LP hydraulic flow control valves”; SMP-5761-5; Oct. 2002 (2 pages).
MEA Winners “Unique intelligent comopletion saves $2.8 million” Completions, Individual: One-Trip Natural Gas Lift Solution; Schlumberger; E&P; Apr. 2005 (1 page).
Weatherford “ROSS Remotely Operated Sliding Sleeve” Hydraulic Flow Control; Weatherford International Ltd. Houston,Texas; 2006-2008 (2 pages).
Weatherford “Pressure Relief Valve” Hydraulic Flow Control; Weatherford International Ltd. Houston, Texas; 2006 (3 pages).
Weatherford “Tubing-Mounted Splice Sub” Intelligent Completions; Weatherford International Ltd. Houston, Texas; 2007 (2 pages).
Ziebel Update “Successful deployments of ZipLog semi-stiff carbon logging “rod” into wellbores acquiring good quality data”; http://www.ziebel.biz
ewsletters/ZiebelUpdate2008September.pdf; Sep. 2008 (3 pages).
Red Spider Technology “eREd saved at least 6 hours rig time by reducing wireline runs . . . ” BP ETAP 22/24a-PWRI-3-eRED Tubing Hanger Plugging Operation; Case Study 01; 005668-00 r2; Feb. 2008 (2 pages).
Red Spider Technology “ZODIAC Optimus Packer” Product Outline Document—ZODIAC Optimus Packer; 003702-00 r0; 2007 (2 pages).
Red Spider Technology “ZODIAC Simplus PVA” Product Outline Document—ZODIAC Simplus PVA; 003997-00 r0; 2007 (3 pages).
Red Spider Technology “Hydraulic Disconnect System” Product Outline Document—Hydraulic Disconnect System; 003346-00 r0; 2007 (3 pages).

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Selective completion system for downhole control and data... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Selective completion system for downhole control and data..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Selective completion system for downhole control and data... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4286474

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.