Selected well completion for improving vertical conformance of s

Wells – Processes – Distinct – separate injection and producing wells

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

166245, E21B 4324

Patent

active

044587589

ABSTRACT:
The method combines the driving of oil by steam from an injection well to a production well with the overriding tendencies of the steam to give both good temperature conformance and good vertical sweep by completing the injection and production wells in limited intervals in the oil-containing formation. The injection well is completed in the bottom 20-30 percent of the vertical thickness of the oil-containing formation and the production well is completed in the bottom 40 percent of the vertical thickness of the oil-containing formation. Once the wells are completed over the limited intervals, steam is injected into the oil-containing formation at a rapid rate and fluids including oil are recovered from the formation via the production well. Injection of steam is continued until the fluid being recovered contains an unfavorable amount of steam or water. If the oil-containing formation overlies a water-saturated formation, optimum vertical conformance is obtained with the completion interval of the injection well in the bottom 20-30 percent of the vertical thickness of the oil-containing formation and the production well completed over 30-40 percent of the vertical thickness of the oil-containing formation beginning at a point above the water-saturated formation a distance of about 10 percent of the vertical thickness of the oil-containing formation.

REFERENCES:
patent: 2969226 (1961-01-01), Huntington
patent: 3142336 (1964-07-01), Doscher
patent: 3280909 (1966-10-01), Closmann et al.
patent: 3358759 (1967-12-01), Parker
patent: 3367419 (1968-02-01), Van Lookeren
patent: 3380527 (1968-04-01), Craighead
patent: 3396791 (1968-08-01), Van Meurs et al.
patent: 3439742 (1969-04-01), Durie
patent: 3500917 (1970-03-01), Lehner et al.
patent: 3838738 (1974-10-01), Redford et al.
patent: 3997004 (1976-12-01), Wu

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Selected well completion for improving vertical conformance of s does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Selected well completion for improving vertical conformance of s, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Selected well completion for improving vertical conformance of s will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1572280

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.