Screwed steel pile and method of construction management...

Hydraulic and earth engineering – Foundation – Columnar structure

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C405S244000, C405S252100, C405S253000, C405S233000

Reexamination Certificate

active

06881014

ABSTRACT:
There is provided a screwed steel pile, the end portion of which is open, characterized in that: an apparent resistance at the pile end portion of the pile is reduced when the ground strength is suddenly increased, so that the pile can be easily penetrated into the ground and an intensity of the finally obtained bearing capacity of the pile is high.The specific means is that a pile end portion of the pile body composed of a steel pipe or a hollow pipe made of another material is made open, and one or a plurality of wings are provided on the outside of the pile end portion of the pile body. The pile end portion of the wing may be protruded downward from a pile end face of the pile body.There is provided a method of construction management for managing the construction of a screwed steel pile having one or a plurality of wings on the outside face of the lower end portion of the pile, comprising the steps of: finding penetrative resistance Rp of a bottom plate portion in the process of construction from the balance between inputted energy, which has been inputted to the pile top portion, and consumed energy which has been released from the bottom plate portion; and controlling to continue and/or complete penetration of the screwed steel according to an intensity of penetrative resistance while the penetrative resistance Rp is being found.

REFERENCES:
patent: 101379 (1870-03-01), Parker
patent: 4790689 (1988-12-01), Henn et al.
patent: 4793740 (1988-12-01), Schellhorn
patent: 5188485 (1993-02-01), Forster et al.
patent: 6394704 (2002-05-01), Saeki et al.
patent: 6425713 (2002-07-01), Fox et al.
patent: 0 588 143 (1994-03-01), None
patent: 769 846 (1957-03-01), None
patent: 49-39045 (1974-10-01), None
patent: 50-143307 (1975-11-01), None
patent: 56-34823 (1981-04-01), None
patent: 61-98818 (1986-05-01), None
patent: 62-25612 (1987-02-01), None
patent: 62-86224 (1987-04-01), None
patent: 63-61440 (1988-04-01), None
patent: 64-39415 (1989-02-01), None
patent: 1-94122 (1989-04-01), None
patent: 2-26634 (1990-02-01), None
patent: 2-26643 (1990-02-01), None
patent: 3-54825 (1991-05-01), None
patent: 3-194017 (1991-08-01), None
patent: 4-179728 (1992-06-01), None
patent: 5-163727 (1993-06-01), None
patent: 7-11637 (1995-01-01), None
patent: 7-011637 (1995-01-01), None
patent: 7-20388 (1995-04-01), None
patent: 7-331654 (1995-12-01), None
patent: 8-226124 (1996-09-01), None
patent: 9-324421 (1997-02-01), None
patent: 9-144459 (1997-06-01), None
patent: 9-324491 (1997-12-01), None
patent: 84 615 (1957-03-01), None
International Search Report for PCT/JP99/01165.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Screwed steel pile and method of construction management... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Screwed steel pile and method of construction management..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Screwed steel pile and method of construction management... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3372111

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.