Resource allocation methods

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

364DIG1, 3642219, 3642813, 3642816, 3642819, G06F 900, G06F 944

Patent

active

054086639

ABSTRACT:
Methods of operating a digital computer to optimize project scheduling. Where the overall effects of a schedule, such as total project duration or cost, are unsatisfactory, the schedule is processed iteratively so that on each iteration a particular task is selected for modification according to a preset policy and data defining an aspect of that task is adjusted in a small step. A schedule is further optimized to fit the available resources by a repetitive process of assigning resources having the proper capabilities to tasks according to a predetermined order of tasks and testing whether the assigned resource can permit shortening of the task duration. Further methods select an optimum mix of capabilities to be provided by each of several resources to be hired for a project.

REFERENCES:
patent: 4890227 (1989-12-01), Watanabe et al.
patent: 5283897 (1994-02-01), Georgiadis et al.
patent: 5303369 (1994-04-01), Borcherding et al.
patent: 5325526 (1994-05-01), Cameron et al.
patent: 5349656 (1994-05-01), Kaneko et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Resource allocation methods does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Resource allocation methods, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Resource allocation methods will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-74551

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.