Recovery of bitumen by steam injection

Wells – Processes – Distinct – separate injection and producing wells

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

166 50, E21B 4324, E21B 33138

Patent

active

039602141

ABSTRACT:
A method of recovering bitumen from a subterranean tar sand formation by the following multi-step method. First, an injection well is drilled to the formation and cased. Perforations are provided in the portion of the injection well contacting the formation. Next, a plurality of production wells are drilled and completed into the formation positioned above and along the length of the injection well. Thereafter, a heated fluid is circulated through the injection well contacting the formation via the perforations and thereby reducing the viscosity of the bitumen contained therein rendering same mobile. Subsequently, the mobilized bitumen is recovered through the plurality of production wells.

REFERENCES:
patent: 1816260 (1931-07-01), Lee
patent: 2874777 (1959-02-01), Tadema
patent: 2906337 (1959-09-01), Hennig
patent: 3017168 (1962-01-01), Carr
patent: 3396791 (1966-09-01), Meurs et al.
patent: 3682244 (1972-08-01), Bowman et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Recovery of bitumen by steam injection does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Recovery of bitumen by steam injection, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Recovery of bitumen by steam injection will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2399593

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.