Production optimization methodology for multilayer...

Data processing: structural design – modeling – simulation – and em – Simulating nonelectrical device or system – Fluid

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C703S002000, C702S013000, C166S250070

Reexamination Certificate

active

07062420

ABSTRACT:
An overall petroleum reservoir production optimization methodology permits the identification and remediation of unstimulated, under-stimulated, or simply poorly performing reservoir completed intervals in a multilayer commingled reservoir that can be recompleted using any of various recompletion methods (including but not limited to hydraulic fracturing, acidization, re-perforation, or drilling of one or more lateral drain holes) to improve the productivity of the well. This provides an excellent reservoir management tool and includes the overall analysis and remediation methodology that has been developed for commingled reservoirs. The specialized recompletion techniques can be used to improve the productivity of previously completed individual reservoir intervals in a commingled reservoir.

REFERENCES:
patent: 4742459 (1988-05-01), Lasseter
patent: 4803873 (1989-02-01), Ehlig-Economides
patent: 5305209 (1994-04-01), Stein et al.
patent: 5675147 (1997-10-01), Ekstrom et al.
patent: 5960369 (1999-09-01), Samaroo
patent: 6101447 (2000-08-01), Poe, Jr.
patent: 6571619 (2003-06-01), Herron et al.
patent: 2002/0043370 (2002-04-01), Poe, Jr.
patent: 0 217 684 (1987-04-01), None
patent: 0 481 866 (1992-04-01), None
Qahtani, A. A New Technique and Field Application for Determining Reservoir Characteristics From Well Performance Data, SPE Paper 68141 presented at the SPE Middle East Oil Show & Conference held in Bahrain, Mar. 2001, pp. 1-9.
Poe, B.D. Evaluation of Reservoir and Hydraulic Fracture Properties in Geopressure Reservoirs, SPE Paper 64732 presented at the SPE International Oil and Gas Conference and Exhibition held in Beijing, China, Nov. 2000, pp. 1-13.
Sarnaniego et al., F. On the Determination of the Pressure-Dependent Characteristics of a Reservoir Through Transient Pressure Testing, SPE Paper 19774, 64th Annual Technical Conference of the Society of Petroleum Engineers, Oct. 1999, pp. 1-12.
Osman, M.E. Pressure Analysis of a Fractured Well in Multilayered Reservoirs, Journal of Petroleum Science and Engineering, vol. 9, Iss. 1, Feb. 1993, pp. 49-66.
SPE 10017 “Optimizing the Development Plan”, Rowan, Mar. 1982.
SPE 52178 “Production Data Analysis and Forecasting Using a Comprehensive Analysis System”, Poe, Mar. 1999.
SPE 38851 “Integrated reservoir Management Via Full Field Modeling, Pt. McIntyre Field, Alaska”, Hagedoorn, Oct. 1997.
SPE 18321 “Putting Geology Into Reservoir Simulations: A Three-Dimensional Modeling Approach”, Johnson, Oct. 1988.
SPE 65108 “Simulation of a Tight Gas Reservoir with Horizontal Multifractured Wells”, Ehrl et al., Oct. 2000.
Schlumberger XP002194463 “Advanced Interpretation of Wireline Logs” 1986.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Production optimization methodology for multilayer... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Production optimization methodology for multilayer..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Production optimization methodology for multilayer... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3657802

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.