Production management system and associated warning process

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Health care management

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C705S007380, C705S002000, C705S014270

Reexamination Certificate

active

07925526

ABSTRACT:
A production unit for which a schedule of tasks is to be accomplished is prepared and stored in a central management device. The unit includes individual electronic devices, control stations, and a network linking the individual electronic devices and the control stations to the central management device. Each individual electronic device includes a device to input the tasks accomplished and problems encountered and further includes a transmission device for information input. The central management device compares data received with the schedule of tasks, generates a warning signal when the comparison detects a gap or discrepancy between the data received and the schedule of tasks, and transmits the warning signal to the individual electronic devices and control stations. The individual electronic devices and the control stations include a device to display the warning signal.

REFERENCES:
patent: 4803039 (1989-02-01), Impink, Jr. et al.
patent: 5748495 (1998-05-01), Arita et al.
patent: 5864784 (1999-01-01), Brayton et al.
patent: 5969697 (1999-10-01), Tani et al.
patent: 6047260 (2000-04-01), Levinson
patent: 6167320 (2000-12-01), Powell
patent: 6396516 (2002-05-01), Beatty
patent: 6748287 (2004-06-01), Hagen et al.
patent: 6853920 (2005-02-01), Hsiung et al.
patent: 7206646 (2007-04-01), Nixon et al.
patent: 2001/0034558 (2001-10-01), Hoskins
patent: 2002/0010519 (2002-01-01), Watanabe et al.
patent: 2002/0065704 (2002-05-01), Wada et al.
patent: 2003/0117439 (2003-06-01), Zver et al.
patent: 2004/0100479 (2004-05-01), Nakano et al.
patent: 1 139 246 (2001-10-01), None
patent: 06103011 (1994-04-01), None
Watson, Benjamin. Effectiveness of Spatial Level of Detail Degradation in the Periphery of Head-Mounted Displays. Graphics, Visualization and Usability Center, Georgia Institute of Technology. CHI 96, Apr. 13-18, 1996.
Watson, Benjamin. Managing Level of Detail through Peripheral Degradation: Effects on Search Performance with a Head-Mounted Display. ACM Transactions on Computer-Human Interaction, vol. 4, Dec. 1997, pp. 323-346.
Microsoft Encarta Online Encyclopedia (Deluxe 2000) and Standard 2002 Reference Library. Retrieved Dec. 3, 2009.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Production management system and associated warning process does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Production management system and associated warning process, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Production management system and associated warning process will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2715069

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.