Data processing: generic control systems or specific application – Specific application – apparatus or process – Product assembly or manufacturing
Reexamination Certificate
2007-03-13
2007-03-13
Picard, Leo (Department: 2125)
Data processing: generic control systems or specific application
Specific application, apparatus or process
Product assembly or manufacturing
C705S029000
Reexamination Certificate
active
11431628
ABSTRACT:
A production control system for producing products from parts, the production control system including a product data obtaining module configured to obtain product data including an effective surplus production quantity from a parent product production location, which is a location producing parent products using the products as direct parts; a part data obtaining module configured to obtain part data including a surplus production quantity from a part production location producing parts; an effective surplus production quantity calculation module configured to calculate an effective surplus production quantity of a production department which produces the products from the parts based on the effective surplus production quantity and the surplus production quantity; and a part data transmission module configured to transmit part data including an effective surplus production quantity of the production department to the part production location.
REFERENCES:
patent: 4646238 (1987-02-01), Carlson et al.
patent: 5237495 (1993-08-01), Morii
patent: 5268838 (1993-12-01), Ito
patent: 5893076 (1999-04-01), Hafner et al.
patent: 5983194 (1999-11-01), Hogge et al.
patent: 6088626 (2000-07-01), Lilly et al.
patent: 7092776 (2006-08-01), Torii et al.
patent: 7092929 (2006-08-01), Dvorak et al.
patent: 2002/0133368 (2002-09-01), Strutt et al.
patent: 2003/0115090 (2003-06-01), Mujtaba et al.
patent: 2003/0204455 (2003-10-01), Eck et al.
patent: 2004/0093101 (2004-05-01), Torii et al.
patent: 2006/0129461 (2006-06-01), Pankl et al
patent: 2006/0206226 (2006-09-01), Torii et al.
patent: 2000-040099 (2000-02-01), None
patent: 2001-312588 (2001-11-01), None
patent: 2002-049449 (2002-02-01), None
patent: 2002-099710 (2002-04-01), None
patent: 2002-117216 (2002-04-01), None
patent: 2002-123635 (2002-04-01), None
patent: 2002-140395 (2002-05-01), None
patent: 2002-140591 (2002-05-01), None
Yuanhui Zhang, et al. “A Macro-Level Scheduling Method Using Langrangian Relaxation”, IEEE Transactions on Robotics and Automation, vol. 17, No. 1, Feb. 2001, pp. 70-79.
Tatsuhiko Hayashi, “Improvement of factory by apparent improvement-reduction in leadtime by information sharing and business Improvement”, Nikkel Digital Engineering, Nikkel BP, Jul. 15, 1998, pp. 78-82.
Taigen Sato, “Utilization of information tool for optimization of distribution”, Keiso, Kogyo Gijutsu Sha, May 1, 2001, vol. 44, No. 6, pp. 76-80.
Shigeki Ohyama, “Group Information strategies for surviving consolidation age,”, Nikkei Information Strategy, Nikkei BP, Jan. 24, 2000, vol. 9, No. 1, pp. 20-37.
Katsumi Shigematsu, “Innovative Algorithm of Scheduling-Lagranglan Decomposition and Coordination Method”, Science of Management, Operations Research, Operations of Japan, Jun. 1, 2000, vol. 45, No. 6, pp. 282-286.
Mitsuru Kuroda, “Innovative Algorithm of Scheduling-Lagranglan Decomposition and Coordination Method”, Science of Management, Operations Research, Operations Research of Japan, Jun. 1, 2000, vol. 45, No. 6, pp. 263-269.
Narimatsu Katsumi
Torii Kentaro
Yamada Hisashi
Oblon & Spivak, McClelland, Maier & Neustadt P.C.
Picard Leo
Rapp Chad
LandOfFree
Production control system, production control method and... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Production control system, production control method and..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Production control system, production control method and... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3799870