Process for the production of fluids from subterranean formation

Wells – Processes – Cementing – plugging or consolidating

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

166300, E21B 4302

Patent

active

039789284

ABSTRACT:
A subterranean formation having at least one borehole is treated with an aqueous gel wherein crude oil and water were produced from the subterranean formation through the borehole until the production of crude oil was reduced due to the presence of sandy material restricting the borehole, and the production of crude oil is increased as a result of said treatment as, for example, by producing crude oil and water from the formation at a lower water-oil ratio as compared to the water-oil ratio prior to treatment with the aqueous gel.

REFERENCES:
patent: 2238930 (1941-04-01), Chamberlain
patent: 3727687 (1973-04-01), Clampitt et al.
patent: 3749174 (1973-07-01), Friedman et al.
patent: 3762476 (1973-10-01), Gall
patent: 3785437 (1974-01-01), Clampitt et al.
patent: 3818998 (1974-06-01), Hessert
patent: 3845822 (1974-11-01), Clampitt et al.
patent: 3881552 (1975-05-01), Hessert

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Process for the production of fluids from subterranean formation does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Process for the production of fluids from subterranean formation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for the production of fluids from subterranean formation will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2168151

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.