Wells – Processes – Cementing – plugging or consolidating
Patent
1975-04-14
1976-09-07
Novosad, Stephen J.
Wells
Processes
Cementing, plugging or consolidating
166300, E21B 4302
Patent
active
039789284
ABSTRACT:
A subterranean formation having at least one borehole is treated with an aqueous gel wherein crude oil and water were produced from the subterranean formation through the borehole until the production of crude oil was reduced due to the presence of sandy material restricting the borehole, and the production of crude oil is increased as a result of said treatment as, for example, by producing crude oil and water from the formation at a lower water-oil ratio as compared to the water-oil ratio prior to treatment with the aqueous gel.
REFERENCES:
patent: 2238930 (1941-04-01), Chamberlain
patent: 3727687 (1973-04-01), Clampitt et al.
patent: 3749174 (1973-07-01), Friedman et al.
patent: 3762476 (1973-10-01), Gall
patent: 3785437 (1974-01-01), Clampitt et al.
patent: 3818998 (1974-06-01), Hessert
patent: 3845822 (1974-11-01), Clampitt et al.
patent: 3881552 (1975-05-01), Hessert
Novosad Stephen J.
Phillips Petroleum Company
Suckfield George A.
LandOfFree
Process for the production of fluids from subterranean formation does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Process for the production of fluids from subterranean formation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for the production of fluids from subterranean formation will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2168151