Process for the production of a bridge girder sectional cantilev

Static structures (e.g. – buildings) – Processes – Anchor – bond – etc.

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

52747, E04G 2114

Patent

active

040731154

ABSTRACT:
There is disclosed a process for the production of a bridge girder system of prestressed concrete in sectional cantilever construction in which prefabricated sections comprising the whole superstructure cross-section formed as hollow boxes, are drawn tightly together in the longitudinal direction of the bridge to form a monolithically acting girder system, the process comprising the steps of arranging a plurality of bridge sections in succession in the longitudinal direction of the bridge, assembling said sections to form a set, said set of sections having been simultaneously prefabricated while separating the surfaces which are to be turned toward one another (in the subsequent incorporation of the individual sections in the bridge structure) by steel sheets, and then moving the sections into position individually so that they are held solely by means of the frictional connection produced by the prestressing between their contacting surfaces.
There is also disclosed apparatus for carrying out a process in accordance with the invention.

REFERENCES:
patent: 942092 (1909-12-01), May
patent: 2751776 (1956-06-01), Streblow et al.
patent: 2963764 (1960-12-01), Finsterwalder
patent: 3022759 (1962-02-01), McCall
patent: 3084481 (1963-04-01), Silberkuhl et al.
patent: 3283457 (1966-11-01), Hart
patent: 3367074 (1968-02-01), Vanich
patent: 3570207 (1971-03-01), Launay
patent: 3788023 (1974-01-01), Macchi
patent: 3794433 (1974-02-01), Schupack

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Process for the production of a bridge girder sectional cantilev does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Process for the production of a bridge girder sectional cantilev, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for the production of a bridge girder sectional cantilev will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-518699

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.