ABSTRACT:

FIELD OF THE INVENTION
This invention relates to the field of rail road cars for carrying wheeled vehicles.
BACKGROUND OF THE INVENTION
Railroad flat cars are used to transport highway trailers from one place to another in what is referred to as intermodal Trailer-on-Flat-Car (TOFC) service. TOFC service competes with intermodal container service known as Container-on-Flat-Car (COFC), and with truck trailers driven on the highway. TOFC service has been in relative decline for some years due to a number of disadvantages.
First, for distances of less than about 500 miles (800 km), TOFC service is thought to be slower and less flexible than highway operation. Second, in terms of lading per rail car, TOFC tends to be less efficient than Container-on-Flat-Car (COFC) service, and tends also to be less efficient than double-stack COFC service in which containers are carried on top of each other. Third, TOFC (and COFC) terminals tend to require significant capital outlays. Fourth, TOFC loading tends to take a relatively long time to permit rail road cars to be shunted to the right tracks, for trailers to be unloaded from incoming cars, for other trailers to be loaded, and for the rail road cars to be shunted again to make up a new train consist. Fifth, shock and other dynamic loads imparted during shunting and train operation may tend to damage the lading. It would be advantageous to improve rail road car equipment to reduce or eliminate some of these disadvantages.
As highways have become more crowded, demand for a fast TOFC service has increased. Recently, there has been an effort to reduce the loading and unloading time in TOFC service, and an effort to increase the length of TOFC trains. There are two methods for loading highway trailers on flat cars. First, they can be side-loaded with an overhead crane or side-lifting fork-lift crane. Loading with overhead cranes, or with specialized fork-lift equipment tends to occur at large yards, and tends to be capital intensive.
The second method of loading highway trailers, or other wheeled vehicles, onto rail road cars having decks for carrying vehicles, is by end-loading. End-loading, or circus loading as it is called, has two main variations. First, a string of cars can be backed up to a permanently fixed loading dock, typically a concrete structure having a deck level with the deck of the rail cars. Alternatively, a movable ramp can be placed at one end of a string of rail car units. In either case, the vehicles are driven onto the rail road cars from one end. Each vehicle can be loaded in sequence by driving (in the case of highway trailers, by driving the trailers backward) along the decks of the rail road car units. The gaps between successive rail car units are spanned by bridge plates that permit vehicles to be driven from one rail car unit to the next. Although circus loading is common for a string of cars, end-loading can be used for individual rail car units, or multiple rail car units as may be convenient.
One way to reduce shunting time, and to run a more cost effective service, is to operate a dedicated unit train of TOFC cars whose cars are only rarely uncoupled. However, as the number of units in the train increases, circus loading becomes less attractive, since a greater proportion of loading time is spent running a towing rig back and forth along an empty string of cars. It is therefore advantageous to break the unit train in several places when loading and unloading. Although multiple fixed platforms have been used, each fixed platform requires a corresponding dedicated dead-end siding to which a separate portion of train can be shunted. It is not advantageous to require a large number of dedicated parallel sidings with a relatively large fixed investment in concrete platforms.
To avoid shunting to different tracks, as required if a plurality of fixed platforms is used, it is advantageous to break a unit train of TOFC rail road cars on a single siding, so that the train can be re-assembled without switching from one track to another. For example, using a 5000 or 6000 ft siding, a train having 60 rail car units in sections of 15 units made up of three coupled five-pack articulated cars, can be split at two places, namely fifteen units from each end, permitting the sequential loading of fifteen units per section to either side of each split. Once loaded, the gaps between the splits can be closed, without shunting cars from one siding to another. Use of a single siding is made possible by moving the ramps to the split location, rather than switching strings of cars to fixed platforms.
In using movable ramps for loading, the highway trailers are typically backed onto the railcars using a special rail yard truck, called a hostler truck. Railcars can be equipped with a collapsible highway trailer kingpin stand. When the highway trailer is in the right position, the hostler truck hooks onto the collapsible stand (or hitch) and pulls it forward, thereby lifting it to a deployed (i.e., raised) and locked position. The hostler truck is then used to push the trailer back to engage the kingpin of the hitch. The landing gear of the highway trailer is lowered, and, in addition, it is cranked downward firmly against the rail road car deck as a safety measure in the event of a hitch failure or the king pin of the trailer is sheared off. Once one trailer has been loaded, the towing rig, namely the hostler truck, drives back to the end of the string, another trailer is backed into place, and the process is repeated until all of the trailers have been loaded in the successive positions on the string of railcars. Unloading involves the same process, in reverse. In some circumstances, circus loaded flat cars can be loaded with trucks, tractors, farm machinery, construction equipment or automobiles, in a similar manner, except that it is not always necessary to use a towing rig.
From time to time, the train consist may be broken up, with various highway-trailer-carrying rail road cars being disconnected, and others being joined. Bridge plates have been the source of some difficulties at the rail car ends where adjacent railroad cars are connected, given the nomenclature “the coupler ends”. Traditionally, a pair of cars to be joined at a coupler would each be equipped with one bridge plate permanently mounted on a hinged connection on one side of the car, typically the left hand side. In this arrangement the axis of the hinge is horizontal and transverse to the longitudinal centerline of the rail car.
Conventionally, for loading and unloading operations, the bridge plate of each car at the respective coupled end is lowered, like a draw bridge, into a generally horizontal arrangement to mate with the adjoining car, each plate providing one side of the path so that the co-operative effect of the two plates is to provide a pair of tracks along which a vehicle can roll. When loading is complete, the bridge plates are pivoted about their hinges to a generally vertical, or raised, position, and locked in place so that they cannot fall back down accidentally.
Conventionally, bridge plates at the coupler ends are returned to the raised, or vertical, position before the train can move, to avoid the tendency to become jammed or damaged during travel. That is, as the train travels through a curve, the bridge plates would tend to break off if left in the spanning position between the coupler ends of two rail road cars. Since bridge plates carry multi-ton loads, they tend to have significant structure and weight. Consequently, the requirement to raise and lower the bridge plates into position is a time consuming manual task contributing to the relatively long time required for loading and unloading. Raising and lowering bridge plates may tend to expose rail-yard personnel to both accidents and repetitive strain injuries caused by lifting.
It would be advantageous to have (a) a bridge plate that can be moved to a storage, or stowed, position, with less lifting; (b) a bridge plate system that does not require the bridge plate to be moved by hand as often,

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Process for rail road car with movable bridge plates does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Process for rail road car with movable bridge plates, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for rail road car with movable bridge plates will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3017358

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.