Process for drilling underground arcuate paths and installing pr

Boring or penetrating the earth – Enlargement of existing pilot throughbore requiring...

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

175 61, 175 65, 175 73, 175386, 175391, 405184, E21B 706, E21B 1026

Patent

active

043196489

ABSTRACT:
A directional drill attached to a drill string having periodic concentric collars is advanced in an inverted arcuate path to form a pilot hole underneath an obstacle followed by a larger concentric washover pipe. When the washover pipe reaches the surface on the other side of the obstacle a first reamer is attached to the end of the washover pipe exiting the drilling path, a second reamer of smaller diameter than the first reamer is attached to the other end of the first reamer by means providing for some separation between the two reamers, and a production casing of smaller diameter than the second reamer is attached to the other end of the second reamer with a swivel. The remaining length of the first portion of casing is supported some distance above the ground on rollers located above and beyond the exit point of the pilot hole. The reamers are operated by rotating the washover pipe and simultaneously drawing the washover pipe through the pilot hole. As the reamers are drawn through the pilot hole the first reamer enlarges the hole to a diameter greater than that of the casing. Drilling mud pumped through the washover pipe exits at the reamers to entrain the dislodged earth and the second reamer compacts it to form a bushing around the sides of the enlarged hole to lubricate the passage of the casing. The reaming operation may be performed without the production casing attached to the reamers followed by a second reaming operation with the casing attached in order to complete the installation.

REFERENCES:
patent: 2204844 (1940-06-01), Chappell
patent: 2349033 (1944-05-01), Elliott
patent: 3589135 (1971-06-01), Ede
patent: 3845828 (1974-11-01), Taylor et al.
patent: 3878903 (1975-04-01), Cherrington
patent: 3894402 (1975-07-01), Cherrington
patent: 3967689 (1976-07-01), Cherrington
patent: 3996758 (1976-12-01), Cherrington
patent: 4003440 (1977-01-01), Cherrington
patent: 4043136 (1977-08-01), Cherrington
patent: 4051911 (1977-10-01), Cherrington
patent: 4078617 (1978-03-01), Cherrington
patent: 4091631 (1978-05-01), Cherrington
patent: 4117895 (1978-10-01), Ward et al.
patent: 4121673 (1978-10-01), Cherrington
patent: 4135586 (1979-01-01), Cherrington
U.S. Dept. of the Interior, Bureau of Mines, Circular 8392, "Horizontal Boring Technology: A State-of-the Art Study", pp. 37 and 54.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Process for drilling underground arcuate paths and installing pr does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Process for drilling underground arcuate paths and installing pr, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for drilling underground arcuate paths and installing pr will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1638025

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.