Plastic and nonmetallic article shaping or treating: processes – Forming structural installations in situ – Sequentially molding in situ different portions or layers on...
Patent
1986-07-07
1989-04-11
Silbaugh, Jan H.
Plastic and nonmetallic article shaping or treating: processes
Forming structural installations in situ
Sequentially molding in situ different portions or layers on...
264 33, 264256, 264269, 264308, 405146, B28B 114, E21D 1110
Patent
active
048204587
ABSTRACT:
A tunnel having an inner surface and extending along an axis is lined with pumpable concrete having a predetermined hardening time and by a form having an annular inner wall and an axially movable front wall. Substantially equal sized batches of pumpable concrete are successively injected into the space through the movable front wall through a plurality of angularly equispaced ports therein. The batches are injected axially backwardly through the ports at such a rate that succeeding batches are injected through each port at a time interval that is substantially smaller than the concrete hardening time. The front wall is displaced forward at such a rate and the batches are sized such that each batch spreads over a predetermined axial and a predetermined angular distance, such that the latter is greater than the former.
REFERENCES:
patent: 1532555 (1925-04-01), Rice
patent: 2144013 (1939-01-01), Donaldson
patent: 3723041 (1973-03-01), Brown
patent: 3966389 (1976-06-01), Shubert
patent: 4150176 (1979-04-01), Beckers
patent: 4437788 (1984-03-01), Walbrohl
patent: 4530621 (1985-07-01), Furuta et al.
patent: 4618298 (1986-10-01), Takamiya et al.
patent: 4645378 (1987-02-01), Hentschel
patent: 4652174 (1987-03-01), Cornely et al.
Babendererde Siegmund
Braach Otto
Lah Gunnar
Dubno Herbert
Hochtief Ag Vorm. Gebr. Helfmann
Kutach Karen D.
Silbaugh Jan H.
Wilford Andrew
LandOfFree
Process for continuously lining a tunnel with extruded concrete does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Process for continuously lining a tunnel with extruded concrete, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for continuously lining a tunnel with extruded concrete will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-665546