ABSTRACT:

The present invention relates to a procedure as defined in the preamble of claim
1
for ensuring the activation of a V5 interface formed between a local exchange and an access node.
Open interfaces (V5.1 and V5.2) between a local exchange and a local network or an access node are defined in the ETSI (European Telecommunications and Standards Institute) standards of the ETS 300 324 and ETS 300 347 series. V5 interfaces enable subscribers belonging to a physically separate local network to be connected to a telephone exchange using a standard interface. In the present application, V5 interface specifically means a dynamic concentrator interface (V5.2) as defined by the standard series ETS 300 347, which consists of one or more (1-16) PCM (Pulse Code Modulation) lines. One PCM line comprises 32 channels or time slots, each of which with a transfer rate of 64 kbit/s, i.e. 2048 kbit/s in all. The V5.2 interface supports analogue telephones as used in the public telephone network, digital, such as ISDN (Integrated Services Digital Network) basic and system subscriber connections as well as other analogue or digital terminal equipment based on semi-fixed connections.
Certain time slots in the V5 interface, which form a channel called C-channel, serve to transmit the protocols used for controlling the interface itself and the calls transmitted over the interface. A C-channel is a 64 kbit/s time slot reserved for this purpose, and it serves to transmit information which may belong e.g. to the Control protocol, Link control protocol, Protection protocol or BCC protocol of the V5 interface, or which may consist of PSTN signalling or ISDN data. Further, according to the standards mentioned above, a C-channel can be reserved for time slots
16
,
15
and/or
31
in the PCM line or V5 interface link. Especially in a V5 interface, the system automatically creates C-channels for the critical protocols (Control, Link control, BCC and Protection), whereas the operator can place the PSTN signalling as desired, either in the same channel as the critical protocols or in another C-channel. In addition, the operator may allocate a maximum of three signalling channels as so-called backup channels. These channels are resorted to in the case of a failure of the link to which the channels were originally allocated. In a V5 interface having more than one 2 Mbit/s links, a link whose physical C-channel in time slot 16 transmits the Control, Link control, BCC and Protection protocols is defined as the primary link. Further, a link whose physical C-channel in time slot 16 only transmits the Protection protocol is a secondary link.
In conjunction with the activation of a V5 interface, certain standard operations are performed to make sure that the LAPV5 protocol in both the access node and in the local exchange can ensure reliable transparent data transfer in the C-channel. The function of the LAPV5 protocol is to monitor the operation of the signalling channels, multiplex layer-
3
signalling into the PCM frame structure and transmit ISDN data in an appropriate manner. In the V5 interface currently used, the system start-up procedure first checks the operation of the primary and secondary links. After this, the Protection protocol data link is activated, first for the primary link and then for the secondary link. However, the system does not take into account the conflicting situation that may arise when the local exchange and the access node receive different responses to the checking of the primary and secondary links, i.e. when one receives a “link ok” message and the other a “link failed” message. Such a situation may occur when e.g. the local exchange takes the primary link out of use (blocking) and a switchover of the primary link to the secondary link is performed. Further, the access node may for some reason be later reset, so the interface must be reactivated at the access node end. However, the reset caused the loss of the primary link blocking data previously obtained, so the access node will try to activate the interface as normal, assuming the primary link to be available. In this situation, the access node will not receive a confirmation about the primary link and remains in a locked state while waiting for a confirmation. On the other hand, a conflict may arise when the V5 interface recovers from a situation in which both the primary and secondary links are broken. In this situation, one of the parties may start signalling via the primary link while the other party starts signalling via the secondary link, depending on which one of the links becomes ready for operation first. Further, during the normal process for activating the V5 interface, a L2ACT procedure consistent with the above-mentioned standard starts the procedure for activating the Protection protocol data link in the normal manner and waits in a predetermined state for a confirmation regarding the primary link. The other party again may detect that the primary link is out of order and try to establish a Protection protocol channel directly in the secondary link. The data link activation procedure remains waiting for a confirmation for the use of the secondary link in another predetermined state. The result is a locked situation where neither party can get a confirmation and the V5 interface cannot be activated.
The last stage in the V5 interface layer 2 activation process is the activation of a PSTN data link. If the PSTN protocol has been configured to use e.g. the C-channel in time slot
15
of the primary link and the primary link is not operational during the sequence, the result is again a locked situation. If the link to which the PSTN data had been configured is out of order, then L2ACT will receive a “release link” message and the activation procedure is halted.
The object of the present invention is to eliminate the problems described above. A specific object of the present invention is to disclose a procedure that makes it possible to avoid the locked situations described above.
A further object of the present invention is to disclose a procedure for ensuring successful activation of a V5 interface in certain failure situations in which the failure does not necessarily require an interruption of the activation of the V5 interface.
As for the features characteristic of the invention, reference is made to the claims.
In the procedure of the invention for ensuring the activation of a V5 interface, preferably a V5.2 interface, formed between a local exchange and an access node and comprising at least two links formed via a PCM line, the operational condition of the links reserved for protocols essential to the operation of the interface as well as the operational condition of the primary and secondary links reserved for protocols used to back them up is checked during the process for activating the interface. To do this in practice, a certain programme block or equivalent on the local exchange side and on the access node side checks the operational condition of the link from its own side; in other words, in the access node a check is carried out to establish whether the connection from the access node to the link is in order, while in the local exchange a corresponding check is carried out. Once it has been ascertained that the link reserved or allocated for the protocol is operational, the protocol can be activated in accordance with a predetermined composition (V5 interface Provision).
According to the invention, the verification of the operational condition of the primary and secondary links is started simultaneously both on the local exchange side and on the access node side. After this, both the local exchange and the access node wait for a confirmation from the other party that the primary and/or secondary links/link are/is operational. If the first confirmation received indicates that the secondary link is operational, then in this case a switchover of the primary link to the secondary link is performed according to the above-mentioned V5 definitions and the new primary link is used for protection in the V5 interfa

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Procedure for ensuring the activation of a V5 interface does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Procedure for ensuring the activation of a V5 interface, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Procedure for ensuring the activation of a V5 interface will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2946006

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.