Electrical computers and digital processing systems: multicomput – Computer network managing – Network resource allocating
Reexamination Certificate
2011-03-29
2011-03-29
Moe, Aung S (Department: 2474)
Electrical computers and digital processing systems: multicomput
Computer network managing
Network resource allocating
C370S254000
Reexamination Certificate
active
07917625
ABSTRACT:
Pooled resources including remotely startable and stoppable computing resources are activated according to a predictive load model. The model includes alert events for providing respective resource activation levels representing either an increase or a decrease in the resource utilization model expected to occur after the respective alert events. If a detected alert event corresponds to an increase, then selected ones of the pooled resources are started. If the detected alert event corresponds to a decrease, then an actual load level is checked, and selected ones of the pooled resources are stopped if the actual load level is less than the respective resource activation level corresponding to the detected alert event.
REFERENCES:
patent: 5996013 (1999-11-01), Delp et al.
patent: 6125105 (2000-09-01), Edwards et al.
patent: 6240453 (2001-05-01), Chang et al.
patent: 6327622 (2001-12-01), Jindal et al.
patent: 6353847 (2002-03-01), Maruyama et al.
patent: 6463454 (2002-10-01), Lumelsky et al.
patent: 6516350 (2003-02-01), Lumelsky et al.
patent: 6584330 (2003-06-01), Ruuska
patent: 6862623 (2005-03-01), Odhner et al.
patent: 7054943 (2006-05-01), Goldszmidt et al.
patent: 7133907 (2006-11-01), Carlson et al.
patent: 7249179 (2007-07-01), Romero et al.
patent: 2002/0194326 (2002-12-01), Gold et al.
patent: 2003/0023885 (2003-01-01), Potter et al.
patent: 2003/0135621 (2003-07-01), Romagnoli
patent: 2003/0208523 (2003-11-01), Gopalan et al.
patent: 2004/0039954 (2004-02-01), White et al.
patent: 2004/0054780 (2004-03-01), Romero
patent: 2004/0255295 (2004-12-01), Stackhouse et al.
patent: 2005/0262235 (2005-11-01), Childress et al.
Merriam-Webster Online Dictionary, “definition of alert.” 2009. Merriam-Webster Online.
The Next Wave: Blade Server Computing, Sun Microsystems, Feb. 2002, pp. 1-17.
Alia Curtis A
Moe Aung S
Sprint Communications Company L.P.
LandOfFree
Predictive processing resource level control does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Predictive processing resource level control, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Predictive processing resource level control will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2653261