Power overload control method useful with enhanced dedicated...

Multiplex communications – Communication over free space – Having a plurality of contiguous regions served by...

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C370S338000

Reexamination Certificate

active

07940721

ABSTRACT:
An exemplary method of controlling communications that may include enhanced dedicated channel (E-DCH) traffic includes setting a total uplink power limit below an allowable power limit. A minimum amount of uplink resources is allocated to each user requesting E-DCH service on an individual user basis such that a cumulative E-DCH power allocation satisfies a selected minimum E-DCH power allocation threshold. A determination whether to grant a non-E-DCH service request is made based upon a relationship between the current total uplink power and the total uplink power limit and a relationship between the selected minimum E-DCH power allocation threshold and a current cumulative E-DCH power.

REFERENCES:
patent: 2004/0198369 (2004-10-01), Kwak et al.
patent: 2004/0219920 (2004-11-01), Love et al.
patent: 2005/0169293 (2005-08-01), Zhang et al.
patent: 2005/0207359 (2005-09-01), Hwang et al.
patent: 2005/0255873 (2005-11-01), Zhang et al.
patent: 2005/0281219 (2005-12-01), Kim et al.
patent: 2006/0062146 (2006-03-01), Sebire et al.
patent: 2006/0215608 (2006-09-01), Lee et al.
patent: 2006/0234638 (2006-10-01), Mueckenheim et al.
patent: 2007/0281708 (2007-12-01), Bakhuizen et al.
patent: 2008/0056182 (2008-03-01), Usuda et al.
patent: 2008/0214197 (2008-09-01), Englund et al.
patent: 2009/0054071 (2009-02-01), Mustapha
patent: 2006077141 (2006-07-01), None
U.S. Appl. No. 11/614,140, filed Dec. 21, 2006, entitled “Power Overload Control Method Useful With High Speed Downlink Packet Access”.
3GPP TS 25.309, V6.6.0 (Mar. 2006), 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; FDD Enhanced Uplink: Overall description; Stage 2 (Release 6).
Tdoc R1-061344, 3GPP TSG RAN WG1 Meeting #45, Shanghai, China, May 8-12, 2006; Change Request 25.215 CR 0170 rev—7.0.0; “Introduction of a Node B measurement for E-DCH RRM”.
Tdoc R1-011447, 3GPP TSG-RAN WG1 #45, Shanghai, China, May 8-12, 2006, 5.6, Maintenance of R99, Re14, Re15, Re16, Re17; Other, “Measurement in support of EDCH scheduling”.
NOKIA: “E-TFC Limitation for UE” 3GPP TSG-RAN WG2 Meeting #45bis; Jan. 10, 2005-Jan. 14, 2005; XP-002370694.
NOKIA: “Resource Allocation Method for E-DCH” 3GPP TSG RAN WG3#44 Meeting; Oct. 4, 2004-Oct. 8, 2004; XP-002486480.
VODAFONE: “UL load measurement requirements for E-DCH” TSG-RAN Working Group 3 #44; Oct. 4, 2004-Oct. 8, 2004; XP-002486481.
International Search Report and Written Opinion of the International Searching Authority for International application No. PCT/US2007/025545 mailed Jul. 21, 2008.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Power overload control method useful with enhanced dedicated... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Power overload control method useful with enhanced dedicated..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Power overload control method useful with enhanced dedicated... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2670967

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.