Telecommunications – Transmitter and receiver at separate stations – Plural transmitters or receivers
Reexamination Certificate
2008-01-21
2011-12-20
Sobutka, Philip (Department: 2618)
Telecommunications
Transmitter and receiver at separate stations
Plural transmitters or receivers
Reexamination Certificate
active
08081997
ABSTRACT:
Systems and methodologies are described that facilitate pilot channel optimization schemes for high data rate communications transmissions. In various illustrative implementations, pilot channel operations can be monitored and controlled by an exemplary base station for one or more cooperating wireless terminals (e.g., user equipment) such that one or more power features of the one or more cooperating wireless terminals can be illustratively changed in response to one or more selected pilot channel operational conditions. In an illustrative operation, an exemplary base station can engage one or more selected pilot channel control operations as part of pilot channel optimization comprising a jump detection technique, operating power control on another channel other than the DPCCH, engaging in delayed power control, engaging in a soft-handoff power control in the instance of a boosted pilot channel, and resolving ambiguity in grant messages resulting from a pilot boost.
REFERENCES:
patent: 6385184 (2002-05-01), Kitade et al.
patent: 7190964 (2007-03-01), Damnjanovic et al.
patent: 7369501 (2008-05-01), Kim et al.
patent: 2005/0014523 (2005-01-01), Pi et al.
patent: 2007/0015476 (2007-01-01), Akbar et al.
patent: 2007/0286128 (2007-12-01), Bae et al.
patent: 2005135434 (2006-05-01), None
International Search Report—PCT/US08/051711—International Search Authority, European Patent Office—Aug. 6, 2008.
Written Opinion—PCT/US08/051711—International Search Authority, European Patent Office—Aug. 6, 2008.
3rd Generation Partnership Project, “Physcial channels and mapping of transport channels onto physical channels (FDD)”, 3GPP TS 25.211 V7.0.0 (Mar. 2006).
3rd Generation Partnership Project, “Spreading and modulation (FDD)”, 3GPP TS 25.213 V6.3.0 (Jun. 2005).
3rd Generation Partnership Project, “Physical layer procedures (FDD)”, 3GPP TS 25.214 V7.1.0 (Jun. 2006).
Translation of Office Action in Russian application 2009131732 corresponding to U.S. Appl. No. 12/017,287, citing US20050014523, US20070015476, RU2005135434 and US2003050084 dated Jan. 18, 2011.
Lundby Stein Arne
Sambhwani Sharad Deepak
Chesney Charles
QUALCOMM Incorporated
Sobutka Philip
LandOfFree
Power and/or data rate control based on pilot channel... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Power and/or data rate control based on pilot channel..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Power and/or data rate control based on pilot channel... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4305028