Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Reservation – check-in – or booking display for reserved space
Reexamination Certificate
2011-05-03
2011-05-03
Choi, Peter (Department: 3623)
Data processing: financial, business practice, management, or co
Automated electrical financial or business practice or...
Reservation, check-in, or booking display for reserved space
Reexamination Certificate
active
07937280
ABSTRACT:
A system (10) for planning and scheduling service events for one or more assets includes a demand optimizer engine (12) that receives information regarding future service requirements for an asset and operating characteristics of the asset. The demand optimizer engine (12) also generates a service plan identifying one or more planned service events during which one or more services are to be performed on the asset and identifying a planned start time and a planned end time for each service event so as to minimize the amount of time the asset is non-operational and the costs associated with each service event. The system (10) also includes a supply optimizer engine (14) that receives the service plan from the demand optimizer engine (12) and generates a service schedule for one or more of the planned service events based on information regarding the flow of one or more parts used in conjunction with the services of each planned service event. The service schedule includes a scheduled start time and a scheduled end time for the one or more planned service events. The supply optimizer engine (14) communicates the service schedule to the demand optimizer engine (12) and the demand optimizer engine (12) modifies the service plan according to the service schedule received from the supply optimizer engine (14).
REFERENCES:
patent: 5216612 (1993-06-01), Cornett et al.
patent: 5231567 (1993-07-01), Matoba et al.
patent: 5287267 (1994-02-01), Jayaraman et al.
patent: 5369570 (1994-11-01), Parad
patent: 5442561 (1995-08-01), Yoshizawa et al.
patent: 5623416 (1997-04-01), Hocker, III
patent: 5630070 (1997-05-01), Dietrich et al.
patent: 5765143 (1998-06-01), Sheldon et al.
patent: 5826040 (1998-10-01), Fargher et al.
patent: 5835898 (1998-11-01), Borg et al.
patent: 5848403 (1998-12-01), Gabriner et al.
patent: 5946662 (1999-08-01), Ettl et al.
patent: 5974395 (1999-10-01), Bellini et al.
patent: 6006171 (1999-12-01), Vines et al.
patent: 6119102 (2000-09-01), Rush et al.
patent: 6151582 (2000-11-01), Huang et al.
patent: 6195590 (2001-02-01), Powell
patent: 6216109 (2001-04-01), Zweben et al.
patent: 6317725 (2001-11-01), Muraoka
patent: 6324522 (2001-11-01), Peterson et al.
patent: 6430541 (2002-08-01), Brown et al.
patent: 6438436 (2002-08-01), Hohkibara et al.
patent: 6486899 (2002-11-01), Bush, Jr.
patent: 6560509 (2003-05-01), Williams et al.
patent: 6606529 (2003-08-01), Crowder et al.
patent: 6801820 (2004-10-01), Lilly et al.
patent: 7003475 (2006-02-01), Friedland et al.
patent: 7313534 (2007-12-01), Scheer
patent: 2001/0032109 (2001-10-01), Gonyea et al.
patent: 2002/0035495 (2002-03-01), Spira et al.
patent: 2002/0107600 (2002-08-01), Crampton et al.
patent: 2005/0004821 (2005-01-01), Garrow et al.
patent: 2005/0065826 (2005-03-01), Baker et al.
Stein, Tom, “Enterprise Apps-Not Just ERP Anymore”, Information Week, Dec. 1, 1997 [retrieved Mar. 16, 2006], pp. 1-6, retrieved from: Dialog, file 9.
Jean-Baptiste Waldner, “CIM: Principles of Computer Integrated Manufacturing,” John Wiley & Sons (1992) (figure) (found at MRP article on wikipedia Apr. 1, 2008).
Carvallo Tassio
Cherneff Jonathan
Leung Heung-Wah
Liu Feng
Booth Udall, PLC
Choi Peter
i2 Technologies US, Inc.
Laureanti Steven J.
LandOfFree
Planning and scheduling of maintenance, repair, and overhaul... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Planning and scheduling of maintenance, repair, and overhaul..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Planning and scheduling of maintenance, repair, and overhaul... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2660982