Data processing: database and file management or data structures – Database design – Data structure types
Reexamination Certificate
2005-06-07
2005-06-07
Rones, Charles (Department: 2164)
Data processing: database and file management or data structures
Database design
Data structure types
C700S100000, C705S007380
Reexamination Certificate
active
06904440
ABSTRACT:
A method of producing a master sub-tier schedule for a Multi-tier Manufacturing Requirements Planning (MRP) system comprising the steps of populating a database with a plurality of identified part/supplier combinations for at least one finished part, populating the database with a plurality of sub-process steps associated with each of the at least one finished part, populating the database with at least one supplier responsible for each of the plurality of sub-process steps, populating the database with at least one lead time and at least one lot requirement associated with each of the plurality of sub-process steps, and sending notification to the primary consumer and the first tier supplier if necessitated by the reviewing of the master sub-tier schedule.
REFERENCES:
patent: 5089970 (1992-02-01), Lee et al.
patent: 5231567 (1993-07-01), Matoba et al.
patent: 5594639 (1997-01-01), Atsumi
patent: 6415196 (2002-07-01), Crampton et al.
patent: 2004/0117048 (2004-06-01), Wei
patent: 2004/0117227 (2004-06-01), Wei
Crate Wendy L
Walsh Ryan J.
Bachman & LaPointe P.C.
Rones Charles
United Technologies Corporation
LandOfFree
Multi-tier material requirements flowdown generation does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Multi-tier material requirements flowdown generation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Multi-tier material requirements flowdown generation will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3511947