ABSTRACT:

BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention generally relates to a mounting and drainage system for prefabricated building panels and, more particularly, to a system for mounting prefabricated building panels onto a building structure and a system for collecting and draining water such as condensation from between the prefabricated building panels and the building.
2. Background Description
Prefabricated building panels are widely used in the construction of buildings, both small and large. These prefabricated building panels are commonly constructed from a number of materials and most preferably concrete. However, when using concrete to fabricate these panels, it is customary to use reinforced concrete in order to provide rigidity and strength to the concrete panels. It is common practice to use wire mesh for the reinforcement of the concrete panels, and to mount the concrete panels to a framing system which includes vertically aligned studs and upper and lower horizontal tracks connected to the vertically aligned studs.
The prefabricated building panels are mounted to a building structure by bolts or welding. However, in order to mount the prefabricated building panels onto a building structure, a crane must first position the panel in its proper location with relation to the building structure, itself The crane must then hold the prefabricated building panel in place while the panels are bolted or welded to the building structure. Typically, the bolting of the prefabricated building panels to the building occurs at a stud of the frame of the prefabricated building panel and the flooring system of the building structure. On the other hand, when welding is used the welding must be performed from both above and below a weld plate attached to the stud. This further delays the mounting of the panel to the building since a welder must perform the weld, including moving all of the welding equipment, from an upper floor to a lower floor level or using two welders and operators.
The bolting or welding procedure is one of the most difficult and time consuming tasks of mounting the prefabricated building panel to the building structure. This is because the prefabricated building panel must be first manually aligned onto the building structure while the prefabricated building panel is on the crane. Once properly aligned, the prefabricated building panel must then be bolted at various places on the studs to the building structure, while maintaining the proper alignment between the prefabricated building panels and building structure. In the case of welding, the welding must be performed on both an upper and lower level (as discussed above). Accordingly, the crane must be used to hold the prefabricated building panel until it is properly bolted or welded to the building structure, and thus cannot be used for other purposes. As can be imagined, this system for mounting the prefabricated building panels to the building structure is thus both time consuming and labor intensive, and an inefficient use of heavy machinery (e.g., crane) at the building site.
Once the panels are properly mounted, water such as condensation may begin to accumulate between the back surface of the panels and the building structure itself. This is a recently discovered phenomenon, and one which has only been recognized since the water accumulation is otherwise unseen during inspection or during construction of the building. This condensation may damage insulation and drywall on the interior of the building. This will also happen when the caulking between the adjacent panels begins to fail. It is also known that some materials, due to their porosity, may also permit condensation to occur. It is not uncommon for the condensation to penetrate the insulation and damage the interior of the building.
Accordingly, what is needed is an efficient temporary mounting system for mounting prefabricated building panels to buildings. What is further needed is a drainage system in order to prevent the accumulation of condensation between the interior building structure and the prefabricated building panels.
SUMMARY OF THE INVENTION
It is therefore an object of the present invention to provide a temporary and a permanent mounting system for mounting a prefabricated building panel to a building.
It is a further object of the present invention to provide a drainage system for use with prefabricated building panels so that water accumulation does not occur between the building structure and the prefabricated building panels.
It is still a further object of the present invention to provide a mounting system that provides for greater structural integrity between the connection of the prefabricated building panels and the building structure.
The present invention provides a temporary mounting and an efficient drainage system for a prefabricated building panel. The prefabricated building panel includes a frame having a plurality of vertical studs and horizontal tracks extending between upper and lower ends of the vertical studs. A section of the prefabricated building panel is mounted to an outer surface of the building frame. The mounting system includes a first mounting plate mounted to one of the vertical studs and a second mounting plate mounted to an adjacent vertical stud. The first and second mounting plates face one another. A landing pad or angle extends between the first and second mounting plates and, in preferred embodiments, is bolted to the facing mounting plates so that it may be removed after the prefabricated building panel is mounted to a building.
In the embodiments of the present invention, additional mounting plates and landing pads may be provided. The additional mounting plates may span between selected additional facing mounting plates and are bolted to the selected additional facing mounting plates. Permanent welding plates each having a slot extending substantially through the center are also provided. These slotted plates may be welded or otherwise mounted to the remaining mounting plates (as well as the selected mounting plates). The welding plates include an outward extending portion opposing the wall of the prefabricated building panel and extend past the studs.
A landing hook which extends outward from the floor of the building may also be provided. The landing pad mounts to the landing hook, and may be retained by a retaining plate extending from the landing hook. In the further embodiments of the present invention, a bracket is mounted to the floor of the building and an adjustment rod is welded to the landing hook and the bracket. The adjustment rod allows for adjustment of the prefabricated building panel once the landing pad is mounted on the landing hook.
The drainage system includes a drain aperture positioned on a lower track between an inner wall of the building and the wall of the prefabricated building panel. A drain tube is connected to a bottom portion of the drain aperture and extends through an aperture of one of the studs, leading to the outside. The drain aperture may be positioned in a trough formed by the lower track. A gutter is formed by caulking the track to the rear surface of the wall and directs condensation from an inner surface of the wall of the prefabricated building panel to the drain aperture. A slot drain may be positioned above the gutter and extends past an edge of the wall of the prefabricated building panel. A caulk seal surrounds an end of the drain tube.


REFERENCES:
patent: 4506482 (1985-03-01), Pracht et al.
patent: 5216858 (1993-06-01), Gilmour
patent: 5699644 (1997-12-01), Smith
patent: 5934033 (1999-08-01), Matsuyama et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Mounting and draining system for prefabricated building panels does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Mounting and draining system for prefabricated building panels, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Mounting and draining system for prefabricated building panels will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2457852

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.